Hi,

I've enabled "Rerun Failed Levels" on a job that does "VirtualFull".
But after VirtualFull fails, the Job is Rerun as normal Full. 

Same behaviour with "Reschedule On Error". A "VirtualFull" is rerun
als normal "Full".

Is that desired or a bug? Running Bacula 5.0.2