Hi,

I have the following problem. I have 2 tapes on my storage server (Tape0, 
Tape1), with no auto-changer.

I'm thinking that the best way to use both of them is to schedule Full backups 
on Tape0 and Diff/Incr backups on Tape1.

I've setup Storage Tape0/Tape1 on director (sd on same machine with Device 
Tape0/Tape1).
I've also setup Pool Tape0/Tape like this:

Pool {
   Name = Tape0
   Storage = Tape0
   Pool Type = Backup
   Recycle = yes
   AutoPrune = yes
   Volume Retention = 3y   # recycle in 3 years
   LabelFormat = "Tape0-"
}

JobDefs {
  Name = "Tape_DefaultJob"
  Type = Backup
  Level = Incremental
  Client = client-fd
  FileSet = "Full Set"
  Schedule = "Tape_Schedule"
  Messages = Standard
  Pool = Tape0
  Priority = 13
  Write Bootstrap = "/var/lib/bareos/%c-tape.bsr"
  Full Backup Pool = Tape0             
  Differential Backup Pool = Tape1 
  Incremental Backup Pool = Tape1   
}

The problem is coming with Storage.
Although I've overridden the pool for each type of backup, the job gets the 
storage from the default Pool -> Tape0

*run job=tape_job level=Differential
Run Backup job
JobName:  tape_job
Level:    Differential
Client:   client-fd
Format:   Native
FileSet:  Full Set
Pool:     Tape1 (From Job DiffPool override)
Storage:  Tape0 (From Pool resource)
When:     2017-04-07 18:19:14
Priority: 13

As you see above it gets the correct Pool (Tape1) but wrong Storage.
I've tried to add Pool, Storage on the Schedule without any difference.

Any recommendations on fixing this?

Any better way to make use of both drives?

thanks

Giannis

-- 
You received this message because you are subscribed to the Google Groups 
"bareos-users" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to [email protected].
For more options, visit https://groups.google.com/d/optout.

Reply via email to