I think the tasks are still "polled" to see if they need to run or not. That is probably what is updating the date. .:.:.:.:.:.:.:.:.:.:.:.:.:. Bobby Hartsfield http://acoderslife.com -----Original Message----- From: Christopher Watson [mailto:skyg...@gmail.com] Sent: Tuesday, October 05, 2010 12:44 PM To: cf-talk Subject: CF9 Paused Scheduled Tasks Still Running
I've got about 20 scheduled tasks set up in a CF9 installation, and I have every single one of them PAUSED. Yes, the second icon from the left in the "Actions" column of the Scheduled Tasks page in CF Admin shows as a "green light" document, with the title (tool tip) of "Resume Scheduled Task" for every task. These tasks are definitely PAUSED. Yet the "Last Run" is continually updating with a new date/time at every interval specified by the task settings. Now, I have most of these tasks set up to save output to a file, and those files are not being created, so that leads me to believe that these tasks are indeed NOT running, contrary to what the date/times in the "Last Run" column is telling me. Is this a known bug? ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~| Order the Adobe Coldfusion Anthology now! http://www.amazon.com/Adobe-Coldfusion-Anthology-Michael-Dinowitz/dp/1430272155/?tag=houseoffusion Archive: http://www.houseoffusion.com/groups/cf-talk/message.cfm/messageid:337882 Subscription: http://www.houseoffusion.com/groups/cf-talk/subscribe.cfm Unsubscribe: http://www.houseoffusion.com/groups/cf-talk/unsubscribe.cfm