I have a 4500 with a 4-port serial card that I am setting up as a frame
relay switch that will host connection for three other 4000Ms.  I have setup
back to back connections before.  My question is...Should I configure the
switch like I normally do - rolled serial cable and configure the 4500
interfaces individually as the dce with clock rate.  Or should I set it up
some other way?
Thanks

_________________________________
FAQ, list archives, and subscription info: http://www.groupstudy.com/list/cisco.html
Report misconduct and Nondisclosure violations to [EMAIL PROTECTED]

Reply via email to