With all the work you want to do up the mast, you may find it easier to pull 
the mast and do the work horizontally rather than vertically. It's not as 
intimidating as it seems. 
Good time to check sheaves at masthead (replace the bushings) and update those 
lights to LED. How's the windvane? How about the wiring for those lights and 
instruments? Antenna? If the cable is original, replace it. Check the standing 
rigging yet? Did all that last spring with the mast on 3 sawhorses, only took a 
couple of days including wait time for new sheaves, would have been tough 
swinging from a sketchy halyard.
Just my 2 cents
Brad
Pulse C&C 33-2
Lake Huron


Anything worth doing requires sails!~~~~~~~_/)~~~~~~~
_______________________________________________

Thanks everyone for supporting this list with your contributions.  Each and 
every one is greatly appreciated.  If you want to support the list - use PayPal 
to send contribution --   https://www.paypal.me/stumurray

Reply via email to