ONCE AGAIN, YOUR MECHANIC SHOULD EASILY BE ABLE TO CREATE A PRO-FORMA 337
FOR 
THE DESIRED ALTERATION AND SUBMIT IT FOR APPROVAL PRIOR TO ANY WORK BEING 
DONE.  THEN WITH THE BASIS FOR FIELD APPROVAL,  PRE-APPROVED THE WORK CAN 
THEN BE COMPLETED AS REQUESTED.  SOMEONE WHO HAS DONE THIS MAY HAVE THE 
DESIRED VERBAGE HANDY AND BE ABLE TO SUPPLYYOU WITH IT, THAT'S ALL IT
TAKES 
TO IMPRESS THEM.  ANYMORE WITH THE PICKINESS OF THE REQUESTS WE SUBMIT
NEARLY 
ALL WORK IN ADVANCE AND GET ABOUT 98% APPROVED FIRST TIME THROUGH./TOM

FOR EXAMPLE PERHAPS SOMETHING LIKE THIS:

"REMOVED 415CD ELEVATOR ASSEMBLY AS SHOWN IN DRAWING NO. 1237723723  ETC. 
DATED   13/13/1948  REPLACED WITH 415E ELEVATOR ASSEMBLY NO.  21332232 PER

DRAWING NO.   417812348734287 FROM THE 415E MANUAL DATED  13/13/1951.  ALL

HARDWARE USED WAS A/N (OR NAS OR MS ETC AS THE CASE MAY BE) AND THE
RIGGING 
WAS DONE IN ACCORDANCE WITH    415E MANUAL  12892387 DATED 13/13/1951.  
AIRCRAFT NOW MEETS TCDATA FOR 415E AND A LETTER REQUESTING MODEL STATUS
FROM 
415CD TO 415E SHALL BE SUBMITTED AT THIS TIME." (END OF EXAMPLE" 

THIS IS A PORTION OF PERHAPS WHAT I WOULD SUBMIT FOR THIS APPROVAL REQUEST

PRIOR TO CUTTING THE ELEVATOR DOWN TO THE E-MODEL OR REMOVING ANYTHING.
THIS 
IS THE TYPE OF REQUEST I PROCESS FOR A NUMBER OF MECHANICS ACROSS THE 
COUNTRY.  THEY COULD DO IT BUT MOST ARE TIMID AND HAVE LITTLE DESIRE TO DO

ANYTHING OUT OF THE ORDINARY.  WE DO IT DAILY.  RIGHT NOW WE ARE DOING 
NUMEROUS MODS TO A GRUMMAN WIDGEON, CESSNA 172 TO 170 CONVERSIONS, J3/L4/ 
C-182 WRECK RENOVATION, AS THERE HAVE BEEN NO NEW FIREWALLS BUILT SINCE
97, 
AND THE CANBERRA BOMBER PROJECT.  THIS IS FITTED IN AROUND REGULAR ANNUALS

AND PHASES ON 135 AND RENTAL AS WELL AS PRIVATE AIRCRAFT COMING AND GOING 
DAILY.  LITTLE TIME LEFT OVER TO GET MY COUPE'S C-85 BACK IN THE AIR AND 
REOPEN THE AVIONICS SHOP IN THE NEXT THREE WEEKS./TOM

<<attachment: winmail.dat>>

Reply via email to