Hi Goutam,
I think this is a great feature. You can keep trying and get one connector
working through first.

Best Regards,
David
Linkedin: https://www.linkedin.com/in/davidzollo



On Sat, Sep 5, 2026 at 9:32 PM Goutam <[email protected]> wrote:

> Hi All,
>
> I have updated STIP-30 with proposed phases, task checklists, and
> links to the existing tracking and implementation
> work:https://github.com/apache/seatunnel/issues/11364
>
> The proposed sequence is:
> 1. Internal reporting foundation (#11512), with its scope unchanged.
> 2. MySQL validation, followed by parallel snapshot and freshness coverage.
> 3. Checkpoint, restore and recovery observability, coordinating with
> the related #11947 failover harness.
> 4. PostgreSQL and multi-source validation.
> 5. Additive job-detail API and bounded metrics.
> 6. Performance, compatibility, stability and documentation gates,
> starting alongside validation.
>
> The first MySQL validation slice is now a dependent draft
> PR:https://github.com/apache/seatunnel/pull/12137
>
> It checks real source/sink data and naturally collected progress
> reports. The focused scenario passed twice on each of Java 8 and 11;
> broader CI and later scenarios remain open. No public API or metrics
> are added.
>
> The updated contract separates per-field value quality from report
> freshness and does not infer a stall from an unchanged offset.
> Enumerator collection is coordinator-owned, but execution may be on
> another member.
>
> Could you review the phase boundaries and remaining stabilization
> gates, particularly checkpoint/restore semantics and validation of
> both position families before freezing the public contract? These
> remain proposed steps, not a release commitment or a claim of full
> design acceptance.
>
> I will keep agreed decisions and linked work recorded on the STIP.
> Thanks all for your time and support
>
> Thanks,
> Goutam
>

Reply via email to