SGTM. Thanks for keeping track of the schedule.

Kenn

On Thu, Nov 15, 2018 at 1:59 PM Chamikara Jayalath <[email protected]>
wrote:

> Hi All,
>
> According to the release calendar [1] branch cut date for Beam 2.9.0
> release is 11/21/2018. Since previous release branch was cut close to the
> respective calendar date I'd like to propose cutting release branch for
> 2.9.0 on 11/21/2018. Next week is Thanksgiving holiday in US and possibly
> some folks will be out so we can try to produce RC1 on Monday after
> (11/26/2018). We can attend to current blocker JIRAs [2] in the meantime.
>
> I'd like to volunteer to perform this release.
>
> WDYT ?
>
> Thanks,
> Cham
>
> [1]
> https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com&ctz=America%2FLos_Angeles
> [2] https://s.apache.org/beam-2.9.0-burndown
>
>