SGTM. Thanks for keeping track of the schedule. Kenn
On Thu, Nov 15, 2018 at 1:59 PM Chamikara Jayalath <[email protected]> wrote: > Hi All, > > According to the release calendar [1] branch cut date for Beam 2.9.0 > release is 11/21/2018. Since previous release branch was cut close to the > respective calendar date I'd like to propose cutting release branch for > 2.9.0 on 11/21/2018. Next week is Thanksgiving holiday in US and possibly > some folks will be out so we can try to produce RC1 on Monday after > (11/26/2018). We can attend to current blocker JIRAs [2] in the meantime. > > I'd like to volunteer to perform this release. > > WDYT ? > > Thanks, > Cham > > [1] > https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com&ctz=America%2FLos_Angeles > [2] https://s.apache.org/beam-2.9.0-burndown > >