+1

Note that we need to temporarily revert
https://github.com/apache/beam/pull/6683 before the release branch cut per
the discussion at
https://lists.apache.org/thread.html/78fe33dc41b04886f5355d66d50359265bfa2985580bb70f79c53545@%3Cdev.beam.apache.org%3E

On Thu, Nov 15, 2018 at 9:18 PM Tim <[email protected]> wrote:

> Thanks Cham
> +1
>
> On 16 Nov 2018, at 05:30, Thomas Weise <[email protected]> wrote:
>
> +1
>
>
> On Thu, Nov 15, 2018 at 4:34 PM Ahmet Altay <[email protected]> wrote:
>
>> +1 Thank you.
>>
>> On Thu, Nov 15, 2018 at 4:22 PM, Kenneth Knowles <[email protected]> wrote:
>>
>>> SGTM. Thanks for keeping track of the schedule.
>>>
>>> Kenn
>>>
>>> On Thu, Nov 15, 2018 at 1:59 PM Chamikara Jayalath <[email protected]>
>>> wrote:
>>>
>>>> Hi All,
>>>>
>>>> According to the release calendar [1] branch cut date for Beam 2.9.0
>>>> release is 11/21/2018. Since previous release branch was cut close to the
>>>> respective calendar date I'd like to propose cutting release branch for
>>>> 2.9.0 on 11/21/2018. Next week is Thanksgiving holiday in US and possibly
>>>> some folks will be out so we can try to produce RC1 on Monday after
>>>> (11/26/2018). We can attend to current blocker JIRAs [2] in the meantime.
>>>>
>>>> I'd like to volunteer to perform this release.
>>>>
>>>> WDYT ?
>>>>
>>>> Thanks,
>>>> Cham
>>>>
>>>> [1]
>>>> https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com&ctz=America%2FLos_Angeles
>>>> [2] https://s.apache.org/beam-2.9.0-burndown
>>>>
>>>>
>>

Reply via email to