I went through Jenkins test suites and failures seems to be known issues
with JIRAs that are release blockers. So we'll cherry-pick fixes to these.
In general though I think it might be hard to pick an exact "green" time
for cutting the release just by eyeballing since different test suites run
at different times.

- Cham



On Wed, Nov 21, 2018 at 12:59 PM Valentyn Tymofieiev <valen...@google.com>
wrote:

> It looks like 2.9.0 branch includes commits from
> https://github.com/apache/beam/pull/7029, which break Python Postcommit
> Test suite. Rollback is in flight:
> https://github.com/apache/beam/pull/7107, and will need to be
> cherry-picked to release branch.
>
> I think we should try to adjust release branch cutting process so that all
> relevant test suites pass on the release branch when we cut it.
>
> On Wed, Nov 21, 2018 at 11:31 AM Chamikara Jayalath <chamik...@google.com>
> wrote:
>
>> Release branch was cut: https://github.com/apache/beam/tree/release-2.9.0
>> Please cherry-pick fixes to 2.9.0 blockers to this branch.
>>
>> Thanks,
>> Cham
>>
>> On Tue, Nov 20, 2018 at 9:00 PM Jean-Baptiste Onofré <j...@nanthrax.net>
>> wrote:
>>
>>> Hi Cham,
>>>
>>> it sounds good to me.
>>>
>>> I'm resuming some works on IOs but nothing blocker.
>>>
>>> Regards
>>> JB
>>>
>>> On 21/11/2018 03:59, Chamikara Jayalath wrote:
>>> > Hi All,
>>> >
>>> > Looks like there are three blockers in the burndown list but they are
>>> > actively being worked on.
>>> >
>>> > If there's no objection I'll create the release branch tomorrow
>>> morning.
>>> > We can cherry-pick fixes to the blockers before building the first RC
>>> > hopefully on Monday.
>>> >
>>> > Thanks,
>>> > Cham
>>> >
>>> >
>>> > On Sat, Nov 17, 2018 at 10:38 AM Kenneth Knowles <k...@apache.org
>>> > <mailto:k...@apache.org>> wrote:
>>> >
>>> >
>>> >
>>> >     On Fri, Nov 16, 2018, 18:25 Thomas Weise <t...@apache.org
>>> >     <mailto:t...@apache.org> wrote:
>>> >
>>> >
>>> >
>>> >         On Thu, Nov 15, 2018 at 10:53 PM Charles Chen <c...@google.com
>>> >         <mailto:c...@google.com>> wrote:
>>> >
>>> >             +1
>>> >
>>> >             Note that we need to temporarily revert
>>> >             https://github.com/apache/beam/pull/6683 before the
>>> release
>>> >             branch cut per the discussion
>>> >             at
>>> https://lists.apache.org/thread.html/78fe33dc41b04886f5355d66d50359265bfa2985580bb70f79c53545@%3Cdev.beam.apache.org%3E
>>> >
>>> >
>>> >         Since it is for the release I would prefer this to be done in
>>> >         the release branch, and not in master.
>>> >
>>> >
>>> >     +1 do it (and all remaining burndown) on the release branch.
>>> >     Tracking Jira targeting 2.9.0?
>>> >
>>> >     Kenn
>>> >
>>> >
>>> >
>>> >
>>> >
>>> >
>>> >
>>> >
>>> >
>>> >             On Thu, Nov 15, 2018 at 9:18 PM Tim
>>> >             <timrobertson...@gmail.com
>>> >             <mailto:timrobertson...@gmail.com>> wrote:
>>> >
>>> >                 Thanks Cham
>>> >                 +1
>>> >
>>> >                 On 16 Nov 2018, at 05:30, Thomas Weise <t...@apache.org
>>> >                 <mailto:t...@apache.org>> wrote:
>>> >
>>> >>                 +1
>>> >>
>>> >>
>>> >>                 On Thu, Nov 15, 2018 at 4:34 PM Ahmet Altay
>>> >>                 <al...@google.com <mailto:al...@google.com>> wrote:
>>> >>
>>> >>                     +1 Thank you.
>>> >>
>>> >>                     On Thu, Nov 15, 2018 at 4:22 PM, Kenneth Knowles
>>> >>                     <k...@apache.org <mailto:k...@apache.org>> wrote:
>>> >>
>>> >>                         SGTM. Thanks for keeping track of the
>>> schedule.
>>> >>
>>> >>                         Kenn
>>> >>
>>> >>                         On Thu, Nov 15, 2018 at 1:59 PM Chamikara
>>> >>                         Jayalath <chamik...@google.com
>>> >>                         <mailto:chamik...@google.com>> wrote:
>>> >>
>>> >>                             Hi All,
>>> >>
>>> >>                             According to the release calendar [1]
>>> >>                             branch cut date for Beam 2.9.0 release is
>>> >>                             11/21/2018. Since previous release branch
>>> >>                             was cut close to the respective calendar
>>> >>                             date I'd like to propose cutting release
>>> >>                             branch for 2.9.0 on 11/21/2018. Next week
>>> >>                             is Thanksgiving holiday in US and possibly
>>> >>                             some folks will be out so we can try to
>>> >>                             produce RC1 on Monday after (11/26/2018).
>>> >>                             We can attend to current blocker JIRAs [2]
>>> >>                             in the meantime.
>>> >>
>>> >>                             I'd like to volunteer to perform this
>>> release.
>>> >>
>>> >>                             WDYT ?
>>> >>
>>> >>                             Thanks,
>>> >>                             Cham
>>> >>
>>> >>                             [1]
>>> https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com&ctz=America%2FLos_Angeles
>>> >>                             [2]
>>> https://s.apache.org/beam-2.9.0-burndown
>>> >>
>>> >>
>>>
>>> --
>>> Jean-Baptiste Onofré
>>> jbono...@apache.org
>>> http://blog.nanthrax.net
>>> Talend - http://www.talend.com
>>>
>>