On Fri, Nov 16, 2018, 18:25 Thomas Weise <t...@apache.org wrote: > > > On Thu, Nov 15, 2018 at 10:53 PM Charles Chen <c...@google.com> wrote: > >> +1 >> >> Note that we need to temporarily revert >> https://github.com/apache/beam/pull/6683 before the release branch cut >> per the discussion at >> https://lists.apache.org/thread.html/78fe33dc41b04886f5355d66d50359265bfa2985580bb70f79c53545@%3Cdev.beam.apache.org%3E >> >> > Since it is for the release I would prefer this to be done in the release > branch, and not in master. >
+1 do it (and all remaining burndown) on the release branch. Tracking Jira targeting 2.9.0? Kenn > > > > >> On Thu, Nov 15, 2018 at 9:18 PM Tim <timrobertson...@gmail.com> wrote: >> >>> Thanks Cham >>> +1 >>> >>> On 16 Nov 2018, at 05:30, Thomas Weise <t...@apache.org> wrote: >>> >>> +1 >>> >>> >>> On Thu, Nov 15, 2018 at 4:34 PM Ahmet Altay <al...@google.com> wrote: >>> >>>> +1 Thank you. >>>> >>>> On Thu, Nov 15, 2018 at 4:22 PM, Kenneth Knowles <k...@apache.org> >>>> wrote: >>>> >>>>> SGTM. Thanks for keeping track of the schedule. >>>>> >>>>> Kenn >>>>> >>>>> On Thu, Nov 15, 2018 at 1:59 PM Chamikara Jayalath < >>>>> chamik...@google.com> wrote: >>>>> >>>>>> Hi All, >>>>>> >>>>>> According to the release calendar [1] branch cut date for Beam 2.9.0 >>>>>> release is 11/21/2018. Since previous release branch was cut close to the >>>>>> respective calendar date I'd like to propose cutting release branch for >>>>>> 2.9.0 on 11/21/2018. Next week is Thanksgiving holiday in US and possibly >>>>>> some folks will be out so we can try to produce RC1 on Monday after >>>>>> (11/26/2018). We can attend to current blocker JIRAs [2] in the meantime. >>>>>> >>>>>> I'd like to volunteer to perform this release. >>>>>> >>>>>> WDYT ? >>>>>> >>>>>> Thanks, >>>>>> Cham >>>>>> >>>>>> [1] >>>>>> https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com&ctz=America%2FLos_Angeles >>>>>> [2] https://s.apache.org/beam-2.9.0-burndown >>>>>> >>>>>> >>>>