Le dim. 16 févr. 2020 à 18:44, Andrea Cosentino <[email protected]> a
écrit :

> You couldn't have a vote for camel sb 3.1 without the first release of
> camel. It's not tempting fate.. it's being rational.
>
> I think what David was referring to is the 24 hours voting period which
I've never seen before.  I would rather choose another way too.

The easier to me is a single vote with any number of repositories, as the
number of repos is really not a problem.
Having one or two votes with one or more repositories is fine, the only
thing is that if there's a problem with the main camel release, the
spring-boot-one would have to be rebuilt too.
I already did some releases where the release was split up between 2
repositories because there was a network issue during the upload and nexus
did create another repo.

Guillaume


> Il dom 16 feb 2020, 17:45 David Jencks <[email protected]> ha
> scritto:
>
> > (1) is fine.
> > I don’t think (2) is consistent with Apache policy, why tempt fate?
> > Maybe what you meant for (2) is to have separate staging repos and
> > separate but concurrent votes? I think that is fine too.
> >
> > thanks
> > david jencks
> >
> > > On Feb 16, 2020, at 8:13 AM, Claus Ibsen <[email protected]>
> wrote:
> > >
> > > Hi
> > >
> > > The source code should now be ready for the release.
> > >
> > > I wanted to start a new thread here as Camel 3.1.0 release is two fold
> > > since we have moved out spring boot into camel-spring-boot.
> > >
> > > So how do we do this release?
> > >
> > > 1)
> > > Can we cut first Camel 3.1.0 and push to staging repo.
> > > And then afterwards release Camel Spring Boot 3.1.0 as well because
> > > all the Camel 3.1.0 JARs was built before and are in your local
> > > m2/repoistory.
> > >
> > > And since this is done right after each other then the binaries will
> > > go to the SAME staging repo. And then we can VOTE on both of them at
> > > the same time, and run it for 72h.
> > >
> > > 2)
> > > Release camel and camel-spring-boot as 2 different, but have eg 24h
> > > VOTE for camel-spring-boot to cut down the total time.
> > >
> > > Any thoughts?
> > >
> > > --
> > > Claus Ibsen
> > > -----------------
> > > http://davsclaus.com @davsclaus
> > > Camel in Action 2: https://www.manning.com/ibsen2
> >
> >
>


-- 
------------------------
Guillaume Nodet

Reply via email to