Hi The source code should now be ready for the release.
I wanted to start a new thread here as Camel 3.1.0 release is two fold since we have moved out spring boot into camel-spring-boot. So how do we do this release? 1) Can we cut first Camel 3.1.0 and push to staging repo. And then afterwards release Camel Spring Boot 3.1.0 as well because all the Camel 3.1.0 JARs was built before and are in your local m2/repoistory. And since this is done right after each other then the binaries will go to the SAME staging repo. And then we can VOTE on both of them at the same time, and run it for 72h. 2) Release camel and camel-spring-boot as 2 different, but have eg 24h VOTE for camel-spring-boot to cut down the total time. Any thoughts? -- Claus Ibsen ----------------- http://davsclaus.com @davsclaus Camel in Action 2: https://www.manning.com/ibsen2