On Dec 11, 2006, at 11:28 AM, Rick McGuire wrote:

Prasad Kashyap wrote:
Geronimo 2.0-SNAPSHOT pulls in OpenEJB-2.2
OpenEJB-2.2 has a dependency on Geronimo-1.2-SNAPSHOT
When the openejb-2.2 branch was created, the Geronimo branch was updated to have a dependency on OpenEJB-2.3. How did this get back to a 2.2 dependency?

It's looking like G 1.2beta and G 2.0m1 are going to get released at about the same time, so I fixed the OpenEJB poms so both versions of Geronimo can depend on the same to-be-released OpenEJB version.

-David


Rick



Cheers
Prasad



Reply via email to