On Fri, Dec 1, 2017 at 11:04 AM, Vladimir Rodionov <vladrodio...@gmail.com>
wrote:

> Thanks, Mike
>
> #1 is done
> #4 is done, but not committed yet
> #3 is questionable to say the least. All B&R tools provide guarantee of
> operation correctness if operation succeeds. Otherwise, what is the point
>      of separate Fault-tolerance work? FT includes correctness guarantee as
> well, we track all the needed WAL files or bulk-loaded files during
> incremental backup
>      and guarantee that every single file will be converted and moved to
> backup destination.If you need additional guarantee - restore backup into
> separate table and do verification yourself.
>
> #2 is ongoing
>
>
Ok. An exception was made for B/R and our Josh made a reasonable plan for
landing it (see head of this thread).

#1 is done.
#2 maybe ongoing but there is no evidence of such out here in public
#3 if a problem, should have been objected to before the plan launch (There
were no objections to the provisions of the plan at time of launch). It is
not done.
#4 doesn't seem done given discussion is ongoing.

We are more than a week over the agreed-to deadline. Let me punt backup
from hbase2.
Thanks all who participated trying to land this feature,
St.Ack



> On Fri, Dec 1, 2017 at 10:30 AM, Mike Drob <md...@apache.org> wrote:
>
> > The list is what Josh proposed in the original email to the list.
> >
> > What is the JIRA for #3?
> >
> > On Fri, Dec 1, 2017 at 12:20 PM, Vladimir Rodionov <
> vladrodio...@gmail.com
> > >
> > wrote:
> >
> > > Where did you get this from, Stack?
> > >
> > > I am doing scale testing now and this is last task on *my* list for
> > beta-1.
> > >
> > > On Thu, Nov 30, 2017 at 10:27 PM, Stack <st...@duboce.net> wrote:
> > >
> > > > On Tue, Nov 7, 2017 at 8:30 PM, Josh Elser <els...@apache.org>
> wrote:
> > > >
> > > > > Folks,
> > > > >
> > > > > I've been working with Vlad and Ted offline to make sure we have a
> > plan
> > > > > that addresses the implementation gaps Vlad sees and the
> > > > barriers-for-entry
> > > > > previously stated to keep the feature in HBase 2.0. My hope is that
> > > this
> > > > > can be an honest discussion given 2.0-beta timelines, with a
> concrete
> > > > > action plan. I'm trying my best to not re-hash the
> > > > logic/reasoning/caveats
> > > > > behind previous concerns; anything folks feel is a blocker that I
> > > haven't
> > > > > covered below is unintentional.
> > > > >
> > > > > The list:
> > > > >
> > > > > 1. Documentation. It must be updated and committed, ensuring it
> > covers
> > > > the
> > > > > details operators/architects need to know to use it effectively
> > > > > (HBASE-16574). Vlad will help with content, myself and/or Frank
> will
> > > get
> > > > it
> > > > > updated to asciidoc.
> > > > >
> > > > > 2. Distributed testing missing. Vlad has taken my previous document
> > on
> > > > > goals and translated that into an implementation outline[1]. Ted
> and
> > I
> > > > have
> > > > > already weighed in -- I believe it hits the salient points for the
> > > > quality
> > > > > of testing we're looking for. I'll get started on this while Vlad
> > does
> > > #4
> > > > > (after consensus on approach, of course). Needs JIRA issue
> (maybe?).
> > > > >
> > > > > 3. Operator utility to verify backups. In abstract, this should
> just
> > be
> > > > > the same guts of a tool like VerifyReplication. In practice, this
> > > should
> > > > be
> > > > > the same code that #3 uses (if not _actually_ the same guts as
> > > > > VerifyReplication). The hope is that this will be encapsulated
> > > > (time-wise)
> > > > > by #3. Needs JIRA issue (maybe?).
> > > > >
> > > > > 4. Polish DistCP for bulk-loaded files/fault-tolerance
> > (HBASE-17852). I
> > > > > don't have specifics here -- will rely on Vlad to correct me if
> > > there's a
> > > > > better JIRA issue to track than the aforementioned. Will rely on
> > > details
> > > > to
> > > > > show up the JIRA issue to track it.
> > > > >
> > > > > Current due dates:
> > > > >
> > > > >
> > > > Checking in on the plan.
> > > >
> > > >
> > > > > 1. End of week (2017/11/10)
> > > > >
> > > >
> > > > I believe this is done.
> > > >
> > > >
> > > > > 2. Before US Thanksgiving (2017/11/22)
> > > > > 3. Same as #2
> > > > > 4. Same as #1
> > > > >
> > > > >
> > > > These were not done in time for thanksgiving? Correct me if I'm
> wrong.
> > > >
> > > > Thanks,
> > > > St.Ack
> > > >
> > > >
> > > >
> > > > > My current thought is that this is reasonable for implementation
> > times,
> > > > > and would not derail the rest of the beta-1 train. I appreciate the
> > > > > patience from all parties, and I hope that those trying to make
> this
> > > > better
> > > > > can find a little more time to give some feedback. Thanks for the
> > long
> > > > read
> > > > > if nothing else.
> > > > >
> > > > > - Josh
> > > > >
> > > > > [1] https://docs.google.com/document/d/1xbPlLKjOcPq2LDqjbSkF6uND
> > > > > AG0mzgOxek6P3POLeMc/edit?usp=sharing
> > > > >
> > > >
> > >
> >
>

Reply via email to