+1 but without a merge of the 1.1 trunk into 1.2. We have to select each individual issue. That is quite time consuming and shouldn't be done with this step.
What about this: move current trunk to a 1.1 branch and move current 1.2 branch to trunk. That is quite a small step without any side effects to the existing code base. Cheers, Mathias 2007/4/18, Martin Marinschek <[EMAIL PROTECTED]>:
Hi *, this is a formal vote on using the 1.2 branch as current now. Steps in doing this: - branch the current head as 1.1.5_1 - merge down the 1.2 branch to current head (that will be a lot of work, I'll tackle it) my +1 for doing this right now. regards, Martin -- http://www.irian.at Your JSF powerhouse - JSF Consulting, Development and Courses in English and German Professional Support for Apache MyFaces