[ https://issues.apache.org/jira/browse/OFBIZ-6085?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14390583#comment-14390583 ]
Christian Carlow commented on OFBIZ-6085: ----------------------------------------- Actually on second thought, storing WIP products between the RAW MATERIAL and FINISHED GOOD bom nodes doesn't seem that bad except that production runs seem to be created to produce the WIP which seems incorrect. If instead production runs were instead created to produce finished goods from materials while creating WIP inventory during the material issuance phase, it seems a good approach. > Add support for production run inventory tracking > ------------------------------------------------- > > Key: OFBIZ-6085 > URL: https://issues.apache.org/jira/browse/OFBIZ-6085 > Project: OFBiz > Issue Type: Improvement > Components: manufacturing > Affects Versions: Trunk > Reporter: Christian Carlow > Assignee: Pierre Smits > > Production run inventory tracking seems worthy of support so that production > managers can get an idea of the department work load. InventoryItemDetails > should be created during production run declarations so that the material > that was stocked out for the production run can be tracked while it is being > manufacturing into the good. Essentially is would be like stock moves or > inventory xfers occuring within the production runs for the task fixed asset > facilities/locations. -- This message was sent by Atlassian JIRA (v6.3.4#6332)