[ https://issues.apache.org/jira/browse/OOZIE-1578?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Bowen Zhang updated OOZIE-1578: ------------------------------- Summary: Coordinator jobs with cron frequency should be invalidated upon submission if nothing would be materialized during run time (was: Coordinator jobs with cron frequency should be invalidated if nothing would be materialized during run time ) > Coordinator jobs with cron frequency should be invalidated upon submission if > nothing would be materialized during run time > ---------------------------------------------------------------------------------------------------------------------------- > > Key: OOZIE-1578 > URL: https://issues.apache.org/jira/browse/OOZIE-1578 > Project: Oozie > Issue Type: Bug > Reporter: Bowen Zhang > Assignee: Bowen Zhang > > If a user specifies a cron frequency that materializes nothing between start > and end time, the coordinator job will remain "RUNNING" forever. This is due > to the way we update coord jobs in StatusTransitService when we select > coordinator jobs to be updated by last modified time of coordinator actions > in function coordTransit(). A coordinator job with no materialized actions > will never be selected to update the terminal status. This is not an issue > before cron frequency is introduced since every coordinator job is guaranteed > to have materialized actions. -- This message was sent by Atlassian JIRA (v6.1#6144)