On Sun, Jul 24, 2016 at 08:39:31AM -0300, Thadeu Lima de Souza Cascardo wrote: > On Sat, Jul 23, 2016 at 08:59:35AM -0700, Ben Pfaff wrote: > > The proposed Open vSwitch release schedule calls for branching 2.6 from > > master on Aug. 1, followed by a period of bug fixes and stabilization, > > with release on Sep. 15. The proposed release schedule is posted here > > for review: > > https://patchwork.ozlabs.org/patch/650319/ > > > > I don't yet know of a reason to modify this schedule. > > > > If you know of reasons to change it, now is an appropriate time to bring > > it up for discussion. In addition, if you have features planned for 2.6 > > that risk hitting master somewhat late for the branch, it is also a good > > time to bring these up for discussion, so that we can plan to backport > > them to the branch early on, or to delay the branch by a few days. > > I would like to see the rtnetlink patchset included. One of things > that needs to happen before that is taking those decisions about > netdev_open and the existence of conflicting port types with the same > name. For example, a system interface and an interface in the database > with the same name but a different type. > > I will post some comments on the discussion we already have opened for > that. > > Just wanted to take the opportunity to mention this expectation of > getting those into 2.6.
For that feature, I need to defer to Jesse (added to the thread). _______________________________________________ dev mailing list dev@openvswitch.org http://openvswitch.org/mailman/listinfo/dev