Trackbacks are working fine, so I'm done now, coding-wise. Just
checking the install guide right now...
Glen
On 08/16/2014 08:56 AM, Dave wrote:
Great! I will test against my site and the blogs.apache.org database today
and hope to update rollerweblogger.org to be running 5.1 sometime tomorrow.
- Dave
On Fri, Aug 15, 2014 at 10:39 PM, Glen Mazza <glen.ma...@gmail.com> wrote:
OK, I'm happy to report the first two items are done, also, Dual DB/Open
ID security seems to run pretty well so we'll have 4 auth options
(everything except CMA) available. I just want to sanity check trackbacks
tomorrow and then I'll be finished on my side for 5.1.
Glen
On 08/13/2014 09:28 PM, Glen Mazza wrote:
Hi team, things I see left for 5.1 (at least on my side):
-- Creating a blog post from the MediaFileFromEdit view is inoperative
perhaps as a result of recent changes I made, I need to revisit it.
-- Need to make sure the User Admin and Edit Profile are showing the
correct fields depending on the security implementation (LDAP, OpenID, or
regular Database)--some have password fields, some don't etc. (We may not
have Dual DB/Open ID ready for 5.1, I don't want to hold off a release for
that though.) This is about halfway done.
-- Check that trackbacks work. I've never used them before and would
like to make sure they basically work.
There are many other tasks that can be done, but those can wait for 5.1.1
and onward. So long as 5.1 is more solid than 5.0.4, we should be OK for a
release.
Regards,
Glen