+1 for version change, as we will change the look and feel. It is not a
mere bug fix any more.

We had to change the look and feel, in the process of addressing some
usability issues.

Though the number changes, we still can stick to the milestone plan.

One concern is the connector POC is lagging. We might have to release Viraj
a bit to get cracking on that too, after this week.


On Tue, Aug 6, 2013 at 3:03 PM, Jasintha Dasanayake <jasin...@wso2.com>wrote:

> HI
>
> Well, IMO Once We complete the ESB graphical editor look and feel(new
> milestone 2.and 3 )  DevS 3.3.0 should be released instead of 3.2.1, after
> that we can do a 3.3.1 bug fixes release and rest of the fixes(which have
> been scheduled for milestone 4 and 5) can be include into 3.3.1
>
> BTW 3.2.1 has been scheduled on 8 th of Aug this also impossible
>
> WDYT ?
>
> Thanks and Regards
> /Jasintha
>
>
>
>
> On Tue, Aug 6, 2013 at 11:19 AM, Asanka Sanjeewa <asan...@wso2.com> wrote:
>
>> Hi,
>>
>> We have changed the Developer Studio milestone plan for 3.2.1 bit. We are
>> going to give high priority for the issues related to usability of the ESB
>> graphical editor and look and feel of the editor. So those issues will be
>> fixed in milestone 2 and 3 although they were scheduled to milestone 4 and
>> 5 earlier.
>>
>> Thanks and Regards,
>> AsankaS.
>>
>> --
>> *Asanka Sanjeewa*
>> Senior Software Engineer
>> Mobile: +94772532924
>> WSO2 Inc. http://wso2.com/
>> Blog: http://asanka-tech-blog.blogspot.com/
>>
>>
>> _______________________________________________
>> Dev mailing list
>> Dev@wso2.org
>> http://wso2.org/cgi-bin/mailman/listinfo/dev
>>
>>
>
>
> --
> *Jasintha Dasanayake
> **Software Engineer
> WSO2 Inc. | http://wso2.com
> lean . enterprise . middleware*
> *
> *
> *mobile :- 077 291 6596*
>



-- 

Thanks,
Samisa...

Samisa Abeysinghe
VP Engineering
WSO2 Inc.
http://wso2.com
http://wso2.org
_______________________________________________
Dev mailing list
Dev@wso2.org
http://wso2.org/cgi-bin/mailman/listinfo/dev

Reply via email to