On Thursday, November 29, 2012 00:35:55 Walter Bright wrote:
> I can see creating a stable D2 and a forward D2 for 6 months at a time
> or so, as has been proposed here. I think that's a good idea. But only
> after D1 is no longer supported.

Well, then we're about to reach the point when it's ripe to do that, because 
D1 is about to no longer be supported. With the beta for 2.061 (whenever that 
happens), we can adjust how we do the beta process to properly use branches, 
and then we can adjust how we deal with stable and development branches of D2 
for future releases.

- Jonathan M Davis

Reply via email to