On 10/12/07, Chris Blouch <[EMAIL PROTECTED]> wrote: > but you have to finally put your foot down and > ship something.
The idea is that you have a code freeze some time before going gold. During that time no new functionality will be included for that release, but within the existing code all major bugs need to be fixed. When the code post-freeze is stable and bug-free-enough, it goes gold. cheers, jane
