From: Andre Detsch <adet...@br.ibm.com>
Date: Tue, 10 Feb 2009 14:35:58 -0200

> 
> When running ethtool -t on an interface that was just
> brought down, the link test was failing. That's because
> we need to perform a reset on the interface to be able
> to check the link status correctly. There is no problem
> on doing such reset right before the test, as the link
> test routine is prepared to wait for autoneg to complete
> if that is the case.
> 
> Signed-off-by: Andre Detsch <adet...@br.ibm.com>

Can I get some Intel ACKs on this?

------------------------------------------------------------------------------
Open Source Business Conference (OSBC), March 24-25, 2009, San Francisco, CA
-OSBC tackles the biggest issue in open source: Open Sourcing the Enterprise
-Strategies to boost innovation and cut costs with open source participation
-Receive a $600 discount off the registration fee with the source code: SFAD
http://p.sf.net/sfu/XcvMzF8H
_______________________________________________
E1000-devel mailing list
E1000-devel@lists.sourceforge.net
https://lists.sourceforge.net/lists/listinfo/e1000-devel

Reply via email to