I just ordered a K2 and SSB adaptor so while I'm anxiously waiting delivery I'm trying to get the shack and bench ready for construction. I've downloaded and briefly read the manuals and I've come up with two questions (the first of many I'm sure). 1. Are there any mods (part additions or deletions) that need to be done to the base K2 if the SSB adaptor is going to be added? Is there anything I should watch out for to prepare the K2 for the SSB board?
2. Are there any recommendations for a vise to hold the PC boards during construction. I've got access to a Panavise with about 6" capacity jaws; is this big enough? Any thoughts will be appreciated. Thanks for the help. Craig Miller K3OOL K2 S/N: ???? _______________________________________________ Elecraft mailing list Post to: Elecraft@mailman.qth.net You must be a subscriber to post to the list. Subscriber Info (Addr. Change, sub, unsub etc.): http://mailman.qth.net/mailman/listinfo/elecraft Help: http://mailman.qth.net/subscribers.htm Elecraft web page: http://www.elecraft.com