KAT2 manual, Rev D, March 22 2001:

Page 6 instructs me to install standoffs at each end of the Control
board -- on the component side -- with the split lock washer between the
standoff and the PC board, and screws coming up from the non-component
side:

I  standoff
I
I
--  lockwasher
====   PC board
I     screw

Later, on page 12, when the L-C board is connected to the Control board,
the manual says to "secure the L-C board to the Control board's
standoffs (above), with lock washers going between the standoffs and the
PC board, *NOT* between the PC board and screws as on the Control
board."

---

...that last bit does not agree with what the manual said to do on p.6.

Right?  Or am I missing something, maybe cleared up in the errata
sheets...?  Well, it is 1:12 a.m. after all, maybe I'm just tired.

--Andrew


_______________________________________________
Elecraft mailing list
Post to: Elecraft@mailman.qth.net
You must be a subscriber to post to the list.
Subscriber Info (Addr. Change, sub, unsub etc.):
 http://mailman.qth.net/mailman/listinfo/elecraft    

Help: http://mailman.qth.net/subscribers.htm
Elecraft web page: http://www.elecraft.com

Reply via email to