KAT2 manual, Rev D, March 22 2001: Page 6 instructs me to install standoffs at each end of the Control board -- on the component side -- with the split lock washer between the standoff and the PC board, and screws coming up from the non-component side:
I standoff I I -- lockwasher ==== PC board I screw Later, on page 12, when the L-C board is connected to the Control board, the manual says to "secure the L-C board to the Control board's standoffs (above), with lock washers going between the standoffs and the PC board, *NOT* between the PC board and screws as on the Control board." --- ...that last bit does not agree with what the manual said to do on p.6. Right? Or am I missing something, maybe cleared up in the errata sheets...? Well, it is 1:12 a.m. after all, maybe I'm just tired. --Andrew _______________________________________________ Elecraft mailing list Post to: Elecraft@mailman.qth.net You must be a subscriber to post to the list. Subscriber Info (Addr. Change, sub, unsub etc.): http://mailman.qth.net/mailman/listinfo/elecraft Help: http://mailman.qth.net/subscribers.htm Elecraft web page: http://www.elecraft.com