KAT2 rev D manual, page 12. Step says
Secure the L-C board to the Control board standoffs using two 4-40 screws and two #4 split lock washers. These lock washers go between the standoffs and the PC board, not between the PC board and screws as on the control board. --- However, page 6 diagram of control board screw/standoff assembly clearly shows a different order: from bottom up: screw, Control board, washer, standoff. Not what the above step says. Is the manual wrong, or am I missing something? Thanks, --Andrew _______________________________________________ Elecraft mailing list Post to: Elecraft@mailman.qth.net You must be a subscriber to post to the list. Subscriber Info (Addr. Change, sub, unsub etc.): http://mailman.qth.net/mailman/listinfo/elecraft Help: http://mailman.qth.net/subscribers.htm Elecraft web page: http://www.elecraft.com