Andrew,
There must be a lockwasher at one end of the standoff - it is an overall
length thing, so it really does not matter which end of the standoff the
lockwasher is placed. Do what seems right - yes, the manual says it
both ways, and that is confusing. It is easier to put the lockwasher on
when first mounting the standoff than it is to slip a lockwasher on top
of the standoff when attaching the second board to the other end - that
is all there is to it. The manual words are correct, the diagram is
older and shows the 'hard' way to do it.
73,
Don W3FPR
Andrew Moore wrote:
KAT2 rev D manual, page 12.
Step says
Secure the L-C board to the Control board standoffs using two 4-40 screws and
two #4 split lock washers. These lock washers go between the standoffs and the
PC board, not between the PC board and screws as on the control board.
---
However, page 6 diagram of control board screw/standoff assembly clearly shows
a different order: from bottom up: screw, Control board, washer, standoff. Not
what the above step says.
Is the manual wrong, or am I missing something?
Thanks,
--Andrew
_______________________________________________
Elecraft mailing list
Post to: Elecraft@mailman.qth.net
You must be a subscriber to post to the list.
Subscriber Info (Addr. Change, sub, unsub etc.):
http://mailman.qth.net/mailman/listinfo/elecraft
Help: http://mailman.qth.net/subscribers.htm
Elecraft web page: http://www.elecraft.com
_______________________________________________
Elecraft mailing list
Post to: Elecraft@mailman.qth.net
You must be a subscriber to post to the list.
Subscriber Info (Addr. Change, sub, unsub etc.):
http://mailman.qth.net/mailman/listinfo/elecraft
Help: http://mailman.qth.net/subscribers.htm
Elecraft web page: http://www.elecraft.com