Thanks Petr, and everyone else who responded. Actually, I do have the 160 meter module in as well as the 60 meter, ssb, dsp and noise blanker. I did things a bit backwards. I decided at the beginning of the summer to get the K2 in September, so I started buying the options during the summer and built them up as they came in. When I completed the K2 I just started plugging them in one at a time so I wouldn't have to wait too long for everything to work. I've been busy with my real work, but I do hope to get a 160 meter loop up this fall (it's already been delayed for too long).
73 George ______________________________________________________________ Elecraft mailing list Home: http://mailman.qth.net/mailman/listinfo/elecraft Help: http://mailman.qth.net/mmfaq.htm Post: mailto:Elecraft@mailman.qth.net This list hosted by: http://www.qsl.net Please help support this email list: http://www.qsl.net/donate.html