Thanks to everyone for your replies.

Using step down transformers, variacs, and current clamps work well for
performing the Ground Bond test here in our safety lab with trained
personnel, but this is not an acceptable procedure for less trained
production line personnel.

The lack of a commercial Ground Bond Tester that will achieve high current
has me wondering if other manufacturers of high current equipment is
performing 100% production line Ground Bond tests.  Am I missing something
here?  Does this test not need to be done outside the safety lab?  Am I
foolishly looking for a easy, safe, production line solution for high
current ground bond testers?

Thanks,
Brian


---------
This message is coming from the emc-pstc discussion list.
To cancel your subscription, send mail to majord...@ieee.org
with the single line: "unsubscribe emc-pstc" (without the
quotes).  For help, send mail to ed.pr...@cubic.com,
jim_bac...@monarch.com, ri...@sdd.hp.com, or
roger.volgst...@compaq.com (the list administrators).

Reply via email to