Hello esteemed colleagues,
 
In IEC 60950:1999 table 2J; EN 60950:1992 table 4; UL 1950:1998 table 4 and
several previous versions of each of these, I am having trouble interpreting
the Additional Clearances Table, sometimes referred to as repetitive peak
clearances.  All these standards derive from the IEC so I will restrict the
my comments to IEC 60950:1999 alone.
 
My concern is with the Maximum Peak Working Voltage in each of the first
three columns of table 2J.  There are two voltages listed, the foot note
indicates that the values in parenthesis are used in accordance with table
2H item 2).  This in turn says that if a manufacturing process is subjected
to quality control program with same level of assurance as Annex R2, then
the values in parenthesis may be used.  Annex R2 indicates that if I want to
use reduced clearances, I may test and inspect for closely controlled
dimensions of the insulating materials.  The bottom line is that under
certain controlled conditions, a product may use reduced spacings.  Sounds
good for me when space is always at a premium.
 
Here's the gotcha...
 
When I look at Table 2H, the clearance values in parenthesis are indeed
smaller, as might be expected for better quality material.  For example:
150Vrms, Mains <150V, PD 2, the reinforced clearance is 2.0mm.  For closely
controlled dimensions (Annex R2) it is 1.0mm.  So far so good.
 
When I look at Table 2J, the values in parenthesis are the voltages not the
clearances.  And in fact the voltage value was reduced not the clearance
value, effectively increasing the physical clearance requirement for closely
controlled dimensions at the same voltage applied, not decreasing.  Stated
another way, if I invoke Annex R2, I must reduce the applied voltage for the
same clearance value!
 
I am missing something here???  For how many revisions has this actually
been in the standard?  It's really hard for me to believe that I am the
first to notice the problem.  Comments from any and all are welcome, but I
would be especially interested to know if an members of TC77 are in this
group and if they have an explanation.
 
BTW - I don't think I will be taking advantage of the increased clearance
requirements any time soon, especially when I have better quality control
over my materials.  
 
Respectfully,
-doug

=================================
Douglas E. Powell
Regulatory Compliance Engineer
Advanced Energy Industries, Inc.
1625 Sharp Point Dr.
Ft. Collins, Co 80525

mailto:[email protected] <mailto:[email protected]> 
http:\\www.advanced-energy.com\ <http://www.advanced-energy.com/> 
=================================



-------------------------------------------
This message is from the IEEE EMC Society Product Safety
Technical Committee emc-pstc discussion list.

To cancel your subscription, send mail to:
     [email protected]
with the single line:
     unsubscribe emc-pstc

For help, send mail to the list administrators:
     Jim Bacher:              [email protected]
     Michael Garretson:        [email protected]

For policy questions, send mail to:
     Richard Nute:           [email protected]

Reply via email to