Cohorts.
        I may be missing the obvious here.
        I have a small UPS heading to Dubai. The requirement is for a British 
style fused plug. The UPS itself, is ungrounded and smack full of agency 
approvals.
        When I asked the vendor for a power cord he provided two, one with the 
ground pin, and the hot and neutral pins. The ground pin isn't connected to 
anything at the equipment end. The second configuration, and the one I 
anticipated getting, didn't have the ground pin on the input, or wall outlet 
side of the power cord.
        Maybe I'm missing something obvious here, but I see no application for 
a floating ground pin on the wall outlet side of this connector given that it 
isn't carried through to the equipment which it is powering?
        What am I missing?
        Gary

-------------------------------------------
This message is from the IEEE EMC Society Product Safety
Technical Committee emc-pstc discussion list.

Visit our web site at:  http://www.ewh.ieee.org/soc/emcs/pstc/

To cancel your subscription, send mail to:
     majord...@ieee.org
with the single line:
     unsubscribe emc-pstc

For help, send mail to the list administrators:
     Ron Pickard:              emc-p...@hypercom.com
     Dave Heald:               davehe...@attbi.com

For policy questions, send mail to:
     Richard Nute:           ri...@ieee.org
     Jim Bacher:             j.bac...@ieee.org

All emc-pstc postings are archived and searchable on the web at:
    http://ieeepstc.mindcruiser.com/
    Click on "browse" and then "emc-pstc mailing list"

Reply via email to