Bob,

This is completely consistent with Measurement Uncertainty.
Statistically - if your margin is better than the measurement
uncertainty then you can guarantee 100% that the product under
test passes. However, the further inside the uncertainty band
your measurement is in, the lower the certainty. Theoretically
even if your measurement exceeds the spec but is inside the
measurement uncertainty band - the test lab statistically is
unable to definitively fail the EUT.

Best Regards
Charles Grasso
Senior Compliance Engineer
Echostar Communications Corp.
Tel:  303-706-5467
Fax: 303-799-6222
Cell: 303-204-2974
Pager/Short Message:  [email protected]
Email: [email protected];  
Email Alternate: [email protected]
 



From: [email protected] [mailto:[email protected]] On Behalf Of
Bob Richards
Sent: Tuesday, July 19, 2005 7:48 AM
To: ieee
Subject: RE: EMC Ethics


My point was that it failed once by 2dB and then later
passed by only 1dB. There is no way, IMHO, that
"measurement uncertainty" could be used as a reason to
accept the passing data and reject the failing data.
This was a test that required maximization of the
signal, who is to say that the passing data had been
properly maximized? It was the same EUT, the same
measuring equipment, the same lab. The only difference
was the technician running the test. 

IMHO, the difference should have been a flag for
someone to question measurement techniques. It took me
a long time to convince anyone that this was needed,
and when it was done it was discovered that there was
as much as a 6dB variation, by the SAME technician,
making the exact same measurement several times in a
row. For the person that did the best job of
maximizing the signal, the variation was less than 0.5
dB.

There is a general consensus that, when going for
compliance data, you should shoot for some margin to
cover this. Obviously, the example I gave had no
margin and could very well be at risk for failing at
another lab. How many times has that happened? I've
been in the middle of a "but it passed at another lab" situation. And, of
course, they tend to question the failing data, not the passing data, which
was the whole point of my original post.

Cheers,
Bob Richards, NCT.



--- "Grasso, Charles" <[email protected]>
wrote:

> Agreed John
> 
> Best Regards
> Charles Grasso
> Senior Compliance Engineer
> Echostar Communications Corp.
> Tel:  303-706-5467
> Fax: 303-799-6222
> Cell: 303-204-2974
> Pager/Short Message:  [email protected]
> Email: [email protected];
> Email Alternate: [email protected]
>  
> 
> 
> -----Original Message-----
> From: [email protected] [mailto:[email protected]] On 
> Behalf Of John Woodgate
> Sent: Thursday, July 14, 2005 11:19 AM
> To: [email protected]
> Subject: Re: EMC Ethics
> 
> 
> Bob Richards <[email protected]> wrote (in
>
<[email protected]>)
> about 'EMC
> Ethics', on Thu, 14 Jul 2005:
> 
> >There were many instances of an EUT being tested
> and failed by one
> >technician, only to be sent back to the lab for
> another technician to
> >test it, on a different shift, and it would pass.
> It may have failed by
> >2db, then pass by 1db. They always accepted the
> passing data.
> 
> What else to do? Many EMC tests are inherently
> subject to very large
> uncertainty, more than any 'uncertainty-guru' will
> admit. There is also 
> 'variability' - a new term coined to cover cases
> where the test results 
> are **extremely** dependent on the exact test
> conditions, such as the 
> mains harmonic emissions of single-phase rectifiers.
> 
> If there is a 3 dB variation between two successive
> tests, more tests
> will very likely reveal a 6 dB variation. You don't
> usually get a 
> *better* answer by repeated testing, you get more
> variation. OK, if the 
> distribution is roughly symmetrical, you can take an
> average, but often 
> you get one or two outliers.
> -- 
> Regards, John Woodgate, OOO - Own Opinions Only.
> Deadlines are 90% of deadliness.
> http://www.jmwa.demon.co.uk Also see
> http://www.isce.org.uk
> 


This message is from the IEEE Product Safety Engineering Society
emc-pstc discussion list.    Website:  http://www.ieee-pses.org/

To post a message to the list, send your e-mail to [email protected]

Instructions:  http://listserv.ieee.org/listserv/request/user-guide.html

List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:

     Scott Douglas             [email protected]
     Mike Cantwell            [email protected]

For policy questions, send mail to:

     Richard Nute:           [email protected]
     Jim Bacher:             [email protected]

All emc-pstc postings are archived and searchable on the web at:

    http://www.ieeecommunities.org/emc-pstc


This message is from the IEEE Product Safety Engineering Society
emc-pstc discussion list.    Website:  http://www.ieee-pses.org/

To post a message to the list, send your e-mail to [email protected]

Instructions:  http://listserv.ieee.org/listserv/request/user-guide.html

List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:

     Scott Douglas             [email protected]
     Mike Cantwell            [email protected]

For policy questions, send mail to:

     Richard Nute:           [email protected]