Perhaps the test house was confusing the requirement for
components to be certified to a UL/CSA standard vs UL recognition
of the component.

>from UL60950-1
1.5.1
...In this standard, certain IEC component standard requirements
are replaced by the relevant requirements of component standards
listed in Annex P.1.

P.1 UL and CSA Component Requirements (mandatory)
...The following components shall comply with the requirements
specified below. All IEC standard requirements in this standard
are either replaced or modified, as noted, by the relevant
requirements of either CSA or UL or both component standards as
listed in this annex.



From: emc-p...@ieee.org [mailto:emc-p...@ieee.org]On Behalf Of
John
Woodgate
Sent: Friday, November 07, 2008 5:18 AM
To: emc-p...@ieee.org
Subject: Re: UL 60950 preliminary inspection / design review

A test-house isn't in a position to 'demand' anything. And it
certainly
has no authority to insist on certification of parts by one
particular
organization.

-

This message is from the IEEE Product Safety Engineering Society
emc-pstc discussion list.    Website:  http://www.ieee-pses.org/

To post a message to the list, send your e-mail to emc-p...@ieee.org

Instructions:  http://listserv.ieee.org/request/user-guide.html

List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:

     Scott Douglas           emcp...@ptcnh.net
     Mike Cantwell           mcantw...@ieee.org

For policy questions, send mail to:

     Jim Bacher:             j.bac...@ieee.org
     David Heald:           dhe...@gmail.com

All emc-pstc postings are archived and searchable on the web at:

    http://www.ieeecommunities.org/emc-pstc


Reply via email to