Dear Peter,

Thanks for your reply.  

For this topic, my opinion is:
-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
- if it is declared and installed for power transmission, the power transmit / 
receive equipment will be installed by skilled person, and be installed in 
pairs. 
 clause 6.3 should be the requirement for power transmit equipment, but 15VA 
should not be the requirement for power transmit equipment.  so, the power 
distributed to and available from the TELECOMMUNICATION NETWORK will be larger 
than 15 VA. 

- if it is not declared and installed for power transmission, the power 
available from a TELECOMMUNICATION NETWORK is considered to be limited to 15 
VA, and so the equipment connected to the TELECOMMUNICATION NETWORK
        ? does not need to comply with §4.6.4.3
        ? does not need a fire enclosure for the connectors, per §4.7.2.2,
7th dashed paragraph
        ? does not need a fire enclosure for materials rated HB75 or HB40
less flammable (under specified conditions), per §4.7.2.2, 9th dashed
paragraph, 2nd dotted subparagraph
        ? use the connector material exemption in §4.7.3.3, 3rd paragraph,
5th dashed subparagraph
        ? etc.
-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
But, in some ETSI standards, 15VA is a limit for power transmission equipment. 
The reason for this limit is interpreted as " according to EN 60950-1 " in 
those standards!
For example, this sentence is extracted from clause 4.3 of ETSI TR 102 614 
V1.1.1 (2010-06):
15 W is the limit according to EN 60950-1 [i.9] for the power on a 
telecommunication network and the A4 interface is
be designed in order to limit the output current to a value that does not cause 
damage to the telecommunication wiring
system due to overheating, under any load condition as required by the same EN 
60950-1 [i.9]. The S/Pfilter should be
dimensioned for the maximum current of 250 mA at 60 V.

so, I am confused with this sentence.



Zhang Guoqing
Huawei Technologies Co., Ltd.
Bantian, Longgang District,Shenzhen 518129, P.R.China
Tel: +86-13686493636
Email: zhangguoq...@huawei.com
http://www.huawei.com

  


-----邮件原件-----
发件人: Peter Tarver [mailto:ptar...@enphaseenergy.com] 
发送时间: 2013年9月17日 4:58
收件人: EMC-PSTC@LISTSERV.IEEE.ORG
主题: Re: [PSES] question on clause 6.3 and 1.4.11 of IEC60950-1

> From: Zhangguoqing (A)
> Sent: Friday, September 13, 2013 17:57
>
> If a transmit equipment can deliver 1.3A current into
> telecommunication network, then in the corresponding
> receive equipment (terminals), 1.3A current is
> available, do you think so?

The 1.3 A limitation is under worst-case loading conditions, and is not
the normal operating current.  For any loading condition up to and
including short-circuit, the output current available from the source
cannot exceed 1.3 A.

This concept is not unlike the LPS current limits in §2.5 in that the
intent is to not create a risk of fire in certain common premises wiring
and connection devices.

> My question is why the standard states the transmit
> equipment can deliver 1.3A (max.), but at the same time
> it states the power available from a TELECOMMUNICATION
> NETWORK is limited to 15 VA?

The 15 VA assumption in §1.4.11 is assumed by definition.  It is the
assumed power available from an unknown/generic telecommunications
network, which may come from a PBX, a central office, a key system or
other equipment, which the equipment under evaluation has no specific
knowledge of.

Because this is assumed by definition it is not a requirement that applies
to equipment outputs in IEC 60950-1.  These requirements are contained
elsewhere in the standard.

If you connect a terminal device to a telecommunications network, the
anticipated power available from the telecommunications network is 15 VA.
By defining this power limitation, "for the purposes of this standard,"
doubt about what the connection is like is ameliorated.

For example, if I were to connect a POTS telephone or other network
(nonPoE) device to a telecommunications network, the POTS device:
        ? does not need to comply with §4.6.4.3
        ? does not need a fire enclosure for the connectors, per §4.7.2.2,
7th dashed paragraph
        ? does not need a fire enclosure for materials rated HB75 or HB40
less flammable (under specified conditions), per §4.7.2.2, 9th dashed
paragraph, 2nd dotted subparagraph
        ? use the connector material exemption in §4.7.3.3, 3rd paragraph,
5th dashed subparagraph
        ? etc.

The same exceptions/exemptions can apply to those portions of a fax
machine, computer, answering machine and the like, where there are no
extenuating circumstances caused by other circuits/components in the
vicinity of the TNV circuit.


Regards,

Peter Tarver


This email message is for the sole use of the intended recipient(s) and may 
contain confidential and/or privileged information. If you are not an intended 
recipient, you may not review, use, copy, disclose or distribute this message. 
If you received this message in error, please contact the sender by reply email 
and destroy all copies of the original message. 


-
----------------------------------------------------------------
This message is from the IEEE Product Safety Engineering Society emc-pstc 
discussion list. To post a message to the list, send your e-mail to 
<emc-p...@ieee.org>

All emc-pstc postings are archived and searchable on the web at:
http://www.ieee-pses.org/emc-pstc.html

Attachments are not permitted but the IEEE PSES Online Communities site at 
http://product-compliance.oc.ieee.org/ can be used for graphics (in well-used 
formats), large files, etc.

Website:  http://www.ieee-pses.org/
Instructions:  http://www.ieee-pses.org/list.html (including how to unsubscribe)
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Scott Douglas <emcp...@radiusnorth.net>
Mike Cantwell <mcantw...@ieee.org>

For policy questions, send mail to:
Jim Bacher:  <j.bac...@ieee.org>
David Heald: <dhe...@gmail.com>

-
----------------------------------------------------------------
This message is from the IEEE Product Safety Engineering Society emc-pstc 
discussion list. To post a message to the list, send your e-mail to 
<emc-p...@ieee.org>

All emc-pstc postings are archived and searchable on the web at:
http://www.ieee-pses.org/emc-pstc.html

Attachments are not permitted but the IEEE PSES Online Communities site at 
http://product-compliance.oc.ieee.org/ can be used for graphics (in well-used 
formats), large files, etc.

Website:  http://www.ieee-pses.org/
Instructions:  http://www.ieee-pses.org/list.html (including how to unsubscribe)
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Scott Douglas <emcp...@radiusnorth.net>
Mike Cantwell <mcantw...@ieee.org>

For policy questions, send mail to:
Jim Bacher:  <j.bac...@ieee.org>
David Heald: <dhe...@gmail.com>

Reply via email to