Has anyone considered or explored the concept of a deconstructed ATR?  I have 
used a deconstructed ATR formula which can be used on a one day basis rather 
than the typical 14 days used. I consider this superior if only because this 
overcomes the typical variance in the best number of days that a system test 
usually reveals. My concept was loosely based on the idea behind the mass index 
except that it uses a multiple of days rather than one day with my 
deconstructed ATR.

Reply via email to