Last month, I wrote about hooking up two 8-inch ADC motors physically in parallel, via a toothed belt. I'm wondering how I need to size the belt. The tail shaft of the motors sticks out about two inches, so that's where the pulley will have to attach. Unlike normal belt drives, this one won't be transferring power to a load; it is mostly just to keep the motors in synch. Can anyone provide guidance? I think Otmar did the same thing for a Porsche 914.
Thanks, Bill _______________________________________________ UNSUBSCRIBE: http://www.evdl.org/help/index.html#usub http://lists.evdl.org/listinfo.cgi/ev-evdl.org For EV drag racing discussion, please use NEDRA (http://groups.yahoo.com/group/NEDRA)