Cliff notes version of the problem:

Two of the modules in my 2P5S Leaf battery conversion for an Electrak E20 tractor seem to have failed in an identical manner. The two modules are a paralleled pair, with the voltage sense terminals bussed together. What appears to have happened is that one cell in each 4-cell (2P2S) module has been removed from the circuit, possibly due to a brief short circuit. The nominal measured 100 Ampere-hour capacity of this pair of cells has dropped to almost precisely 50 Ampere-hours.

I have a feeling that the brief short circuit may have opened an overcurrent device in one of the pouch cells in the paired half of each of the two modules.

Before I go on a long search trying to find healthy modules (SoH ~75-80%) to replace these, it might be worth a go to try and repair/replace/reset the overcurrent fuse/breaker/fusible link that is causing the problem.

The new problem is: trying to get the sheet metal off the exterior of the module in a non destructive manner. Anyone here have tips or tricks? So far, I've managed to gently pry the coverings almost loose, but not enough to even peek inside. Are there hidden fasteners or some such, or are these modules glued into a solid, non-openable brick?

Cor? Phil? Jay? Anyone?

_______________________________________________
Address messages to [email protected]
No other addresses in TO and CC fields
HELP: http://www.evdl.org/help/

Reply via email to