Hi everyone,

As we are wrapping up the storyboards, wireframes, & storycards, we have run into one last design question about the the Date Picker that touches on coding and accessibility, and hope folks on the list can offer some advice.

Ideally, we'd like to show dates in in the next and previous months that overlap into the current month's grid (see the date pickers near the bottom of this page: http://wiki.fluidproject.org/display/fluid/Date+Picker+Storyboard+-+Date+and+Time+Separate+Fields+with+Default) . This allows users to more easily put the current month within the context of the next and previous months, and provides them with more potentially clickable links (instead of blank boxes), which will in some instances reduce the need to navigate between months.

However, there are several potential issues we see with this:

1) Screen readers may read the dates as being within the wrong month. Talking with Mike Elledge, if the dates are in a table he advises us that the screen reader will read something like "Feb 2008 tuesday 1." If we show Jan 31st in the same grid, it may in accurately read "Feb 2008 Monday 31." Is there a way to set up the table so it reads properly, or perhaps not use tables at all?

2) Will there be issues with folks with cognitive disabilities not understanding that the 31 is not part of February? Is there any way other than completely removing the numbers for next/previous months to alleviate this problem?

3) We haven't come up with a great design solution to strongly distinguish non-selectable dates (e.g. when entering a Due Date for an assignment, dates *before* the Open Date shouldn't be selectable) and dates in the previous month. Currently we have them both as the same gray, but the difference is on mouse-over the non-selectable dates do not receive a blue highlight. We do think we should provide different CSS classes to these cells so that different styling *can* be used, but in our design we don't see it as being very meaningful to use different colors of gray (which is sort of the standard for both dates in the next/previous month *and* non-selectable dates).

Do folks have any advice on these issues?

Thanks very much!
Allison & Erin

Allison Bloodworth
Senior User Interaction Designer
Educational Technology Services
University of California, Berkeley
(415) 377-8243
[email protected]




_______________________________________________________
fluid-work mailing list - [email protected]
To unsubscribe, change settings or access archives,
see http://fluidproject.org/mailman/listinfo/fluid-work

Reply via email to