2012/2/28 James Buren <[email protected]>:
> After difficulties we had during 1.6 release cycle, I am proposing a rule
> addition. In addition to the freeze we do from rc2 -> stable,
> I am proposing we do a new feature and major bump freeze on everything that
> is not in a -extra group as its main group after we
> are past the pre2 release of a release cycle. The way I feel is, major
> changes in the main groups should be implemented by the
> time we have pre2 released. This gives us a 2 month period instead of a mere
> two weeks to resolve outstanding issues with the
> main branch. I don't wish to apply this to anything in extra, as that has few
> important packages, and is way too massive for us
> to do any real quality control on. Thoughts?
+1 from me.
--