> You can get 12-24 TB in a server today, which means the loss of a server
> generates a lot of traffic -which argues for 10 Gbe.
> 
> But
>   -big increase in switch cost, especially if you (CoI warning) go with
> Cisco
>   -there have been problems with things like BIOS PXE and lights out
> management on 10 Gbe -probably due to the NICs being things the BIOS
> wasn't expecting and off the mainboard. This should improve.
>   -I don't know how well linux works with ether that fast (field reports
> useful)
>   -the big threat is still ToR switch failure, as that will trigger a
> re-replication of every block in the rack.

Keeping the amount of disks per node low and the amount of nodes high should 
keep the impact of dead nodes in control. A ToR switch failing is different - 
missing 30 nodes (~120TB) at once cannot be fixed by adding more nodes; that 
actually increases ToR switch failure. Although such failure is quite rare to 
begin with, I guess. The back-of-the-envelope-calculation I made suggests that 
~150 (1U) nodes should be fine with 1Gb ethernet. (e.g., when 6 nodes fail in a 
cluster with 150 nodes with four 2TB disks each, with HDFS 60% full, it takes 
around ~32 minutes to recover. 2 nodes failing should take around 640 seconds. 
Also see the attached spreadsheet.) This doesn't take ToR switch failure in 
account though. On the other hand - 150 nodes is only ~5 racks - in such a 
scenario you might rather want to shut the system down completely rather than 
letting it replicate 20% of all data.

Cheers,
Evert