richard wrote: > > I think it would probably be possible to avoid the library > > version change and do a 1.30.1 release instead, though that would > > need careful checking and possibly a degree of rewriting any > > changes that break abi.
I think there was at least one incompatible change, although I may be wrong. (I stopped receiving those mails from git push operations.) > > However, am I right in thinking that would be pointless if GUI > > and back need a library version change at the next release > > anyway? Yes, you are basically right that it won't help us much if Base has a point release (in case GUI/Back have a bump).