Stephen Turner <[EMAIL PROTECTED]> wrote: > I don't know much about Excel, but I think DATE(1970,1,1) can be > spelled 25569. If I'm right, that would save you at least 63 > strokes.
Also, "/24/60/60" can be spelled "/86400". That saves another 21. -- Keith C. Ivey <[EMAIL PROTECTED]> Washington, DC