Stephen Turner <[EMAIL PROTECTED]> wrote:

> I don't know much about Excel, but I think DATE(1970,1,1) can be
> spelled 25569. If I'm right, that would save you at least 63
> strokes.

Also, "/24/60/60" can be spelled "/86400".  That saves another 
21.

-- 
Keith C. Ivey <[EMAIL PROTECTED]>
Washington, DC

Reply via email to