On first glance, I think I'm basically +1 on this proposal -- with the caveat that I'd like the cutover to happen after the 7.10.2 release and platform release that goes with it, so we can sort of move everything in sync. (I.e. there should be a uniform point in time in which we start pointing all the downloads on the site from 7.8 series to 7.10 series).
--Gershom On Thu, Jun 25, 2015 at 1:23 PM, Christopher Done <[email protected]> wrote: > I also volunteer to work with Erik to make this happen if enough > agreement is expressed. > _______________________________________________ > haskell-infrastructure mailing list > [email protected] > http://community.galois.com/mailman/listinfo/haskell-infrastructure >
_______________________________________________ haskell-infrastructure mailing list [email protected] http://community.galois.com/mailman/listinfo/haskell-infrastructure
