[ https://issues.apache.org/jira/browse/HDFS-14758?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16993191#comment-16993191 ]
hemanthboyina commented on HDFS-14758: -------------------------------------- test failures and findbug is not realted . Please review the patch > Decrease lease hard limit > ------------------------- > > Key: HDFS-14758 > URL: https://issues.apache.org/jira/browse/HDFS-14758 > Project: Hadoop HDFS > Issue Type: Improvement > Reporter: Eric Payne > Assignee: hemanthboyina > Priority: Minor > Attachments: HDFS-14758.001.patch, HDFS-14758.002.patch, > HDFS-14758.003.patch, HDFS-14758.004.patch > > > The hard limit is currently hard-coded to be 1 hour. This also determines the > NN automatic lease recovery interval. Something like 20 min will make more > sense. > After the 5 min soft limit, other clients can recover the lease. If no one > else takes the lease away, the original client still can renew the lease > within the hard limit. So even after a NN full GC of 8 minutes, leases can be > still valid. > However, there is one risk in reducing the hard limit. E.g. Reduced to 20 > min. If the NN crashes and the manual failover takes more than 20 minutes, > clients will abort. -- This message was sent by Atlassian Jira (v8.3.4#803005) --------------------------------------------------------------------- To unsubscribe, e-mail: hdfs-issues-unsubscr...@hadoop.apache.org For additional commands, e-mail: hdfs-issues-h...@hadoop.apache.org