Exactly right.  Back in the good old days when real sysprogs were cowboys 
and COBOL programmers ran away, scared (and scarred).  

*smirk*

--
Tom Schmidt 
Madison, WI 


On Tue, 12 Sep 2006 12:50:56 -0400, Veilleux, Jon L wrote:

>You are thinking back to the days when UCC1 zapped IBM O/C/EOV modules
>instead of using SVCs and exit points to install their code. With zaps
>you MUST have the correct level of IBM code so pre-req entries were
>required.
>
 ...which followed what I wrote:  
>
>My experience must predate Tom's - I certainly do remember UCC-1
>maintenance PRE-ing IBM PTFs (for Open/Close/EOV/etc.).  However, that
>was a long, long, long time ago and Russell's current methods might well
>no longer need that.  I do not, for example, recall having PTF issues
>with CA-
>1 in the slightly more recent past.  And I am not now a CA-1 customer so
>I
>(a) can't say and (b) don't have a vote.
>
>But if Russell believes he can ship working code with or without SMP/E,
>I believe him.
>
>My present work location has contract requirements that ALL software
>must be installed via SMP/E (if SMP/E is at all an option).  Software
>that is not available via SMP/E is generally not allowed here.

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [EMAIL PROTECTED] with the message: GET IBM-MAIN INFO
Search the archives at http://bama.ua.edu/archives/ibm-main.html

Reply via email to