Do I have to issue a separate command for each scartch volme?

If I understand correctly I have to:
1. find all of the scratch volumes in CA-1
2. Issue the PRIVATE,VSN command for each of them
3. Issue the SCRATCH,VSN command for each of them.

Is this correct?

I have opened an issue with CA support, but haven't heard from them yet.

Gadi

________________________________________
From: Russell Witt [res09...@verizon.net]
Sent: 20 September 2012 15:27
To: 'IBM Mainframe Discussion List'
Cc: גדי בן אבי
Subject: RE: Syncronize between CA-1 and IBM ATL and VTS

When you say that CTSSYNC does not work; it is probably a situation where
the TCDB (the OAM database on the MF itself) and the Library Manager (the
database down in the ATL itself) themselves are not in sync. Originally, for
performance reasons within CTSSYNC we would compare the desired state
(scratch or active) with what the TCDB says and if those two were already
in-sync we would not perform an update. However, if the TCDB and LM
themselves are not in-sync (something that should never happen but often
does) the tape will never be used.

A couple of ways to correct this, but the best way is to do a "double reset"
with CTSSYNC. First, use CTSSYNC to set the status of all the scratch
volumes to PRIVATE (ACTIVE). This forces the status to ACTIVE in the TCDB.
Then, use CTSSYNC again to set the status of all the scratch volumes you
just set to PRIVATE back to SCRATCH status.

If the TCDB or originally said SCRATCH and the LM originally said ACTIVE
what this double-change does is to first set the TCDB to ACTIVE (so it now
matches the LM) and then sets both back to SCRATCH. If you simply tried to
set the status to SCRATCH to begin with; OAM have seen that its database was
already in SCRATCH and never have notified the LM. Which is probably where
your problem lies.

If you have any further problems, please contact CA 1 support. Even though
this is an out-of-support release; they should be able to help.

Russell Witt
L2 Support Manager

-----Original Message-----
From: IBM Mainframe Discussion List [mailto:IBM-MAIN@LISTSERV.UA.EDU] On
Behalf Of âãé áï àáé
Sent: Thursday, September 20, 2012 6:45 AM
To: IBM-MAIN@LISTSERV.UA.EDU
Subject: Re: Syncronize between CA-1 and IBM ATL and VTS

They are using CA-1 v5.2.
Yes, I kno they are very back level, but there are no plans to upgrade.
Gadi

________________________________________
From: IBM Mainframe Discussion List [IBM-MAIN@LISTSERV.UA.EDU] On Behalf Of
Jousma, David [david.jou...@53.com]
Sent: 20 September 2012 14:43
To: IBM-MAIN@LISTSERV.UA.EDU
Subject: Re: Syncronize between CA-1 and IBM ATL and VTS

What version of CA1?  We had this problem when going from CA1 V11.5 to
V12.0.   I'm not the CA1 support person here, but CA support knew exactly
the problem.  Something in CA1 changed how the library manager is being
notified(or not, with the newer versions).   There was something we had to
turn on.  I think the CA1 version of CBRUXENT became a requirement.

_________________________________________________________________
Dave Jousma
Assistant Vice President, Mainframe Services david.jou...@53.com
1830 East Paris, Grand Rapids, MI  49546 MD RSCB2H p 616.653.8429 f
616.653.2717

-----Original Message-----
From: IBM Mainframe Discussion List [mailto:IBM-MAIN@LISTSERV.UA.EDU] On
Behalf Of ??? ?? ???
Sent: Thursday, September 20, 2012 7:29 AM
To: IBM-MAIN@LISTSERV.UA.EDU
Subject: Syncronize between CA-1 and IBM ATL and VTS

Hi,

I am supporting a customer that has CA-1 and an IBM ATL and VTS.
Their main site has no syncronization problems, but at the backup site, CA-1
and the ATL are out of sync.
CA-1 reports many virtual scratch tapes, while the VTS reports none.

There is no online communication between the two sites.
Once every few months, the backup site is restored from tapes. This restore
includes the CA-1 TMC and AUDIT datasets.

How do I sync the ATL and VTS with CA-1?
I tried using the CTSSYNC utility, but it doesn't seem to work.

Any help would be apprreciated.

Thanks
Gadi

לשימת לבך, בהתאם לנהלי החברה וזכויות החתימה בה, כל הצעה, התחייבות או מצג מטעם 
החברה, מחייבים מסמך נפרד וחתום על ידי מורשי החתימה של החברה, הנושא את לוגו 
החברה או שמה המודפס ובצירוף חותמת החברה. בהעדר מסמך כאמור (לרבות מסמך סרוק) 
המצורף להודעת דואר אלקטרוני זאת, אין לראות באמור בהודעה אלא משום טיוטה לדיון,
ואין להסתמך עליה לביצוע פעולה עסקית או משפטית כלשהי.


Please note that in accordance with Malam's signatory rights, no offer, 
agreement, concession or representation is binding on the company,
unless accompanied by a duly signed separate document (or a scanned version 
thereof), affixed with the company's seal.

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to lists...@listserv.ua.edu with the message: INFO IBM-MAIN

Reply via email to