June,

That is strange. I did not receive it.

Pat

> -----Original Message-----
> From: ???(June Yong Young) [mailto:juney at samsung.com]
> Sent: Wednesday, August 05, 2015 2:32 AM
> To: Lankswert, Patrick; Keane, Erich
> Cc: soonhwang.choi at samsung.com; iotivity-dev at lists.iotivity.org; Mirani,
> Jawid
> Subject: RE: RE: [dev] About preparing 0.9.2 Release Schedule
> 
> Hi Pat,
> 
> Sure, the subject "IoTivity 0.9.2 RC3 release" of the email was the
> announcement for 0.9.2-RC3 tag.
> 
> 
> June Yong Young
> OIC Open Sourece WG Project Planning & Requirement TG Chair IoTivity Release
> Function Lead
> 
> Samsung Electronics Co.,Ltd.
> Software R&D Center, IoT Solution Lab. | Web & Convergence Team Principal
> Engineer
> 
> T: +82-31-301-6107, M: +82-10-9530-6107
> E-mail :juney at samsung.com
> 
> 
> -----Original Message-----
> From: Lankswert, Patrick [mailto:patrick.lankswert at intel.com]
> Sent: Wednesday, August 05, 2015 12:34 AM
> To: juney at samsung.com; Keane, Erich
> Cc: soonhwang.choi at samsung.com; iotivity-dev at lists.iotivity.org; Mirani,
> Jawid
> Subject: RE: RE: [dev] About preparing 0.9.2 Release Schedule
> 
> June,
> 
> Did this happen? I did not see an announcement that the tag was made. The
> changes between RC2 and RC3 should be published so folks know whther they
> should pull an update from git.
> 
> Pat
> 
> > -----Original Message-----
> > From: ???(June Yong Young) [mailto:juney at samsung.com]
> > Sent: Monday, August 03, 2015 9:54 PM
> > To: Keane, Erich; Lankswert, Patrick
> > Cc: soonhwang.choi at samsung.com; iotivity-dev at lists.iotivity.org;
> > Mirani, Jawid
> > Subject: RE: RE: [dev] About preparing 0.9.2 Release Schedule
> >
> > Erich, Pat,
> >
> > Thank you for confirmation.
> > Samsung QA is checking now if Samsung patches are ok and then we will
> > finally tag "0.9.2-RC3" on 0.9.2-dev branch in about 2~3 hours.
> >
> > Regards
> > June
> >
> > June Yong Young
> > OIC Open Sourece WG Project Planning & Requirement TG Chair IoTivity
> > Release Function Lead
> >
> > Samsung Electronics Co.,Ltd.
> > Software R&D Center, IoT Solution Lab. | Web & Convergence Team
> > Principal Engineer
> >
> > T: +82-31-301-6107, M: +82-10-9530-6107 E-mail :juney at samsung.com
> >
> >
> > -----Original Message-----
> > From: Keane, Erich [mailto:erich.keane at intel.com]
> > Sent: Tuesday, August 04, 2015 9:03 AM
> > To: Lankswert, Patrick
> > Cc: soonhwang.choi at samsung.com; iotivity-dev at lists.iotivity.org;
> > Mirani, Jawid; juney at samsung.com
> > Subject: Re: RE: [dev] About preparing 0.9.2 Release Schedule
> >
> > The Discovery/Connectivity code is all ready for 0.9.2-RC3 as far as I can 
> > tell.
> > This is what we have in the 0.9.2-dev branch since the RC2:
> >
> > --Fix for IOT-646
> > --Fix Issue where CBOR String Arrays weren't correctly copying all
> > values --Fix for
> > IOT-632 --Fix for IOT-622 --Fix for IOT-627 --Fixed unprocessed
> > timed-out messages in the stack --Fixed Server De-registration of
> > observers --Fix OcConnectivityType/OcConnectivityFlags merge issues in
> > Android Stack -- Android Sample Apps permissions correctly set in
> > AndroidManifest.xml
> >
> >
> >
> > On Mon, 2015-08-03 at 17:04 +0000, Lankswert, Patrick wrote:
> > > Erich,
> > >
> > > It is really important that we (you) articulate the list of patches
> > > and the issues
> > that they resolve for Jawid. The sooner that he validates (or not) the
> > sooner we can notify the community with regards to feature stability.
> > >
> > > Thanks! You rock!
> > >
> > > Pat
> > >
> > > > -----Original Message-----
> > > > From: Keane, Erich
> > > > Sent: Monday, August 03, 2015 12:25 PM
> > > > To: Lankswert, Patrick
> > > > Cc: soonhwang.choi at samsung.com; iotivity-dev at lists.iotivity.org;
> > > > Mirani, Jawid; juney at samsung.com
> > > > Subject: Re: RE: [dev] About preparing 0.9.2 Release Schedule
> > > >
> > > > I think we're all set, Ill bring it up in standup today, but I'm
> > > > pretty sure the Android ones that Joey/Tim pushed were all that we
> > > > really
> > needed.
> > > >
> > > >
> > > > On Mon, 2015-08-03 at 16:19 +0000, Lankswert, Patrick wrote:
> > > > > Erich,
> > > > >
> > > > >
> > > > >
> > > > > Do you have a list of fixes that you think are high priority for
> > > > > 0.9.2? If so, get them pushed.
> > > > >
> > > > >
> > > > >
> > > > > Pat
> > > > >
> > > > >
> > > > >
> > > > > From:??? [mailto:juney at samsung.com]
> > > > > Sent: Monday, August 03, 2015 11:30 AM
> > > > > To: Lankswert, Patrick; ???; Keane, Erich;???
> > > > > Cc: iotivity-dev at lists.iotivity.org; Mirani, Jawid
> > > > > Subject: Re: RE: [dev] About preparing 0.9.2 Release Schedule
> > > > >
> > > > >
> > > > >
> > > > >
> > > > > Pat, Jawid,
> > > > >
> > > > >
> > > > >
> > > > >
> > > > > We have no option now anyway.
> > > > >
> > > > >
> > > > > Samsung have fixed some issues that occurred on RC2, so could
> > > > > you fix your all the issues by around 17:00 PST?
> > > > >
> > > > >
> > > > > Then after that we will tag RC3 tomorrow morning(Korea time)
> > > > >
> > > > >
> > > > >
> > > > >
> > > > >
> > > > > Regards
> > > > >
> > > > >
> > > > > June
> > > > >
> > > > >
> > > > > Sent from Mobiledesk
> > > > >
> > > > >
> > > > >
> > > > >
> > > > > ---?? ???---
> > > > > ??? : Lankswert, Patrick/patrick.lankswert at intel.com
> > > > > ???? : 2015/08/03 23:39 (GMT+09:00) ?? : RE: [dev] About
> > preparing
> > > > > 0.9.2 Release Schedule
> > > > >
> > > > > June,
> > > > >
> > > > > I do not have that information. I need to defer to Jawid.
> > > > >
> > > > > Pat
> > > > >
> > > > > > -----Original Message-----
> > > > > > From: iotivity-dev-bounces at lists.iotivity.org
> > > > > > [mailto:iotivity-dev- bounces at lists.iotivity.org] On Behalf Of
> > > > > > ???(June Yong Young)
> > > > > > Sent: Friday, July 31, 2015 11:18 PM
> > > > > > To: Keane, Erich; soonhwang.choi at samsung.com
> > > > > > Cc: iotivity-dev at lists.iotivity.org; Mirani, Jawid
> > > > > > Subject: Re: [dev] About preparing 0.9.2 Release Schedule
> > > > > >
> > > > > > Hi Pat, Jawid,
> > > > > >
> > > > > > Could you urgently let us know when Intel?s QA will complete
> > > > > > 2nd
> > > > > round test and
> > > > > > when 3rd QA will be completed if it starts on 8/3 again, so
> > > > > > that we
> > > > > can judge
> > > > > > whether or not we can make a 0.9.2 release before 8/7?
> > > > > >
> > > > > > You know, if we cannot deliver 0.9.2 to SWG on 8/7, then PF#3
> > > > > > will
> > > > > be at risk.
> > > > > >
> > > > > > June Yong Young
> > > > > > OIC Open Sourece WG Project Planning & Requirement TG Chair
> > > > > > IoTivity
> > > > > Release
> > > > > > Function Lead
> > > > > >
> > > > > > Samsung Electronics Co.,Ltd.
> > > > > > Software R&D Center, IoT Solution Lab. | Web & Convergence
> > > > > > Team
> > > > > Principal
> > > > > > Engineer
> > > > > >
> > > > > > T: +82-31-301-6107, M: +82-10-9530-6107 E-mail
> > > > > > :juney at samsung.com
> > > > > >
> > > > > > -----Original Message-----
> > > > > > From: Keane, Erich [mailto:erich.keane at intel.com]
> > > > > > Sent: Saturday, August 01, 2015 1:20 AM
> > > > > > To: soonhwang.choi at samsung.com
> > > > > > Cc: sungkyu.ko at samsung.com; woochul.shim at samsung.com;
> > > > > > iotivity- dev at lists.iotivity.org; Mirani, Jawid;
> > > > > > juney at samsung.com; Agrawal,
> > > > > Sachin
> > > > > > Subject: Re: [dev] About preparing 0.9.2 Release Schedule
> > > > > >
> > > > > > We have an issue in the resource model with the Android stack
> > > > > > as
> > > > > well that
> > > > > > we're waiting on, plus a handful of bug-fixes that have been
> > > > > > pushed
> > > > > since the
> > > > > > RC2. I would be very much FOR an RC3.
> > > > > >
> > > > > > -Erich
> > > > > >
> > > > > >
> > > > > > On Fri, 2015-07-31 at 08:37 +0000, SOON HWANG CHOI wrote:
> > > > > > > Dear All
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > Test result of 2nd round test for Samsung modules may be
> > > > > > > reported
> > > > > at
> > > > > > > next Monday (8/3) because consent of 2nd roud test was delayed.
> > > > > > >
> > > > > > > Currently we found below major defects. so we think RC3
> > > > > > > should be released for 0.9.2 Official release.
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > 1. PPM Tizen sample app is not working if Invoke button is
> > > > > > > pushed
> > > > > > >
> > > > > > > 2. PPM Android sample app is not working if "START PLUGIN"
> > > > > > > button
> > > > > is
> > > > > > > pushed
> > > > > > >
> > > > > > > 3. RM's build error in linux 64ibt environment
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > Thanks
> > > > > > >
> > > > > > > Soonhwang Choi
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > ------- Original Message -------
> > > > > > >
> > > > > > > Sender : ???<juney at samsung.com> S6(??)/??/IoT Solution
> > > > > Lab(S/W
> > > > > > > ??)/????
> > > > > > >
> > > > > > > Date : 2015-07-31 09:51 (GMT+09:00)
> > > > > > >
> > > > > > > Title : About preparing 0.9.2 Release Schedule
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > Hi Pat, George, Jawid,
> > > > > > >
> > > > > > > When will Intel?s QA complete 2nd round test?
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > Hi Pat, Jawid, SoonHwang,
> > > > > > >
> > > > > > > Could you let us know the 2nd round test result by 7/31, so
> > > > > > > that
> > > > > we
> > > > > > > can find out whether or not we need RC3?
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > 0.9.2 : ?Spec vA Compliant + Spec vB Partial?
> > > > > > >
> > > > > > > ? Type for Release : Minor release, Schedule Driven,
> > > > > > > PlugFest
> > > > > > > #3
> > > > > > >
> > > > > > > ? Schedule (5 weeks ahead of QA completion) (cf. Original QA
> > > > > request
> > > > > > > is 6 weeks ahead of QA start)
> > > > > > >
> > > > > > > ? 6/22, API freeze & Programmer?s guide freeze
> > > > > > >
> > > > > > > ? 7/20, Feature complete & Review Complete and make ?0.9.2-RC1?
> > > > > > > release to QA
> > > > > > >
> > > > > > > ? 7/24, QA 1st round complete
> > > > > > >
> > > > > > > ? 7/27->7/28, 0.9.2-RC2 release to QA
> > > > > > >
> > > > > > > ? 7/31, QA 2nd round complete
> > > > > > >
> > > > > > > ? 8/03, Website Open (if no issue)
> > > > > > >
> > > > > > > ? 8/17 week, Plug Fest #3
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > June Yong Young
> > > > > > > OIC Open Sourece WG Project Planning & Requirement TG Chair
> > > > > > >
> > > > > > > IoTivity Release Function Lead
> > > > > > >
> > > > > > >
> > > > > > > Samsung Electronics Co.,Ltd.
> > > > > > >
> > > > > > > Software R&D Center, IoT Solution Lab. | Web & Convergence
> > > > > > > Team
> > > > > > >
> > > > > > > Principal Engineer
> > > > > > >
> > > > > > > T: +82-31-301-6107, M: +82-10-9530-6107
> > > > > > >
> > > > > > > E-mail :juney at samsung.com
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > From: iotivity-dev-bounces at lists.iotivity.org
> > > > > > > [mailto:iotivity-dev-bounces at lists.iotivity.org] On Behalf
> > > > > > > Of ?? ?(June Yong Young)
> > > > > > > Sent: Wednesday, July 29, 2015 4:50 PM
> > > > > > > To: 'Agrawal, Sachin'; '???'; Jawid Mirani_Intel; ?????;
> > > > > ??
> > > > > > ???_SE
> > > > > > > Cc: iotivity-dev at lists.iotivity.org
> > > > > > > Subject: Re: [dev] About preparing 0.9.2 Security Release
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > Hi Sachin,
> > > > > > >
> > > > > > > Thank you for the tagging 0.9.2-RC2.
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > Hi Pat, George, Jawid,
> > > > > > >
> > > > > > > I think still there is no more schedule delay required
> > > > > > > although
> > > > > RC2
> > > > > > > has been 1 day delayed.
> > > > > > >
> > > > > > > However I am not sure what is Intel QA?s position about 7/31
> > > > > > > QA
> > > > > 2nd
> > > > > > > round completion date although Samsung QA is positive.
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > 0.9.2 : ?Spec vA Compliant + Spec vB Partial?
> > > > > > >
> > > > > > > ? Type for Release : Minor release, Schedule Driven,
> > > > > > > PlugFest
> > > > > > > #3
> > > > > > >
> > > > > > > ? Schedule (5 weeks ahead of QA completion) (cf. Original QA
> > > > > request
> > > > > > > is 6 weeks ahead of QA start)
> > > > > > >
> > > > > > > ? 6/22, API freeze & Programmer?s guide freeze
> > > > > > >
> > > > > > > ? 7/20, Feature complete & Review Complete and make ?0.9.2-RC1?
> > > > > > > release to QA
> > > > > > >
> > > > > > > ? 7/24, QA 1st round complete
> > > > > > >
> > > > > > > ? 7/27->7/28, 0.9.2-RC2 release to QA
> > > > > > >
> > > > > > > ? 7/31, QA 2nd round complete
> > > > > > >
> > > > > > > ? 8/03, Website Open (if no issue)
> > > > > > >
> > > > > > > ? 8/17 week, Plug Fest #3
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > June Yong Young
> > > > > > > OIC Open Sourece WG Project Planning & Requirement TG Chair
> > > > > > >
> > > > > > > IoTivity Release Function Lead
> > > > > > >
> > > > > > >
> > > > > > > Samsung Electronics Co.,Ltd.
> > > > > > >
> > > > > > > Software R&D Center, IoT Solution Lab. | Web & Convergence
> > > > > > > Team
> > > > > > >
> > > > > > > Principal Engineer
> > > > > > >
> > > > > > > T: +82-31-301-6107, M: +82-10-9530-6107
> > > > > > >
> > > > > > > E-mail :juney at samsung.com
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > From: Agrawal, Sachin [mailto:sachin.agrawal at intel.com]
> > > > > > > Sent: Wednesday, July 29, 2015 3:24 AM
> > > > > > > To: juney at samsung.com; ???
> > > > > > > Cc: iotivity-dev at lists.iotivity.org
> > > > > > > Subject: RE: Re: [dev] About preparing 0.9.2 Security
> > > > > > > Release
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > Hi All,
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > I created the ?0.9.2-RC2? tag and pushed it to Iotivity repo.
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > Thanks
> > > > > > >
> > > > > > > Sachin
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > From: Agrawal, Sachin
> > > > > > > Sent: Tuesday, July 28, 2015 9:36 AM
> > > > > > > To: 'juney at samsung.com'; ???
> > > > > > > Cc: iotivity-dev at lists.iotivity.org
> > > > > > > Subject: RE: Re: [dev] About preparing 0.9.2 Security
> > > > > > > Release
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > Since all the existing tags have upper-case letters ?RC?, I
> > > > > > > assume June meant to tag it with ?0.9.2-RC2?.
> > > > > > >
> > > > > > > Am I right?
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > Thanks
> > > > > > >
> > > > > > > Sachin
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > From: ??? [mailto:juney at samsung.com]
> > > > > > > Sent: Tuesday, July 28, 2015 8:01 AM
> > > > > > > To: ???; Agrawal, Sachin; ???
> > > > > > > Cc: iotivity-dev at lists.iotivity.org
> > > > > > > Subject: Re: Re: [dev] About preparing 0.9.2 Security
> > > > > > > Release
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > Hi Sachin
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > What is the progress?
> > > > > > >
> > > > > > >
> > > > > > > As soon as the review is completed, please tag "0.9.2-rc2".
> > > > > > >
> > > > > > > Sent from Mobiledesk
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > ---?? ???---
> > > > > > > ??? : ???(June Yong Young)
> > > > > > > ???? : 2015/07/28 15:31 (GMT+09:00) ?? : Re: [dev] About
> > > > preparing
> > > > > > > 0.9.2 Security Release
> > > > > > >
> > > > > > > Hi Sachi,
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > When will the review be finished? Everybody is waiting for
> > > > > > > the completion by today.
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > Regards
> > > > > > >
> > > > > > > June
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > June Yong Young
> > > > > > > OIC Open Sourece WG Project Planning & Requirement TG Chair
> > > > > > >
> > > > > > > IoTivity Release Function Lead
> > > > > > >
> > > > > > >
> > > > > > > Samsung Electronics Co.,Ltd.
> > > > > > >
> > > > > > > Software R&D Center, IoT Solution Lab. | Web & Convergence
> > > > > > > Team
> > > > > > >
> > > > > > > Principal Engineer
> > > > > > >
> > > > > > > T: +82-31-301-6107, M: +82-10-9530-6107
> > > > > > >
> > > > > > > E-mail :juney at samsung.com
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > From: Agrawal, Sachin [mailto:sachin.agrawal at intel.com]
> > > > > > > Sent: Tuesday, July 28, 2015 2:52 AM
> > > > > > > To: juney at samsung.com; ???
> > > > > > > Cc: iotivity-dev at lists.iotivity.org
> > > > > > > Subject: RE: About preparing 0.9.2 Security Release
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > Hi June,
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > SRM/Provisioning Mgr API is unable to discover the secure
> > > > > > > port of
> > > > > the
> > > > > > > new device.
> > > > > > >
> > > > > > > Jira ticket: https://jira.iotivity.org/browse/IOT-626
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > It is SpecA mandatory as Provisioning Tool is dependent on this.
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > Code change is currently under review and will be pushed in
> > > > > 0.9.2-dev
> > > > > > > as soon as it finishes review process.
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > Thanks
> > > > > > >
> > > > > > > Sachin
> > > > > > >
> > > > > > >
> > > > > > > From: ??? [mailto:juney at samsung.com]
> > > > > > > Sent: Monday, July 27, 2015 9:12 AM
> > > > > > > To: ???; Agrawal, Sachin; iotivity-dev at lists.iotivity.org
> > > > > > > Cc: Kesavan, Vijay S; Heldt-Sheller, Nathan; ???; ???; ??
> > > > > ?; ???;
> > > > > > ???;
> > > > > > > ???; ???; ??
> > > > > > > Subject: Re: About preparing 0.9.2 Security Release
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > Hi Sachin, WooCheol,
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > Please share the security issues in iotivity mailing list.
> > > > > > >
> > > > > > >
> > > > > > > - what is the security issue?
> > > > > > >
> > > > > > >
> > > > > > > - SpecA mandatory related issue? Or not?
> > > > > > >
> > > > > > >
> > > > > > > - When will it be fixed?
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > Regards
> > > > > > >
> > > > > > >
> > > > > > > June
> > > > > > >
> > > > > > >
> > > > > > > Sent from Mobiledesk
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > ---?? ???---
> > > > > > > ??? : ???
> > > > > > > ???? : 2015/07/27 16:58 (GMT+09:00) ?? : About preparing
> > 0.9.2
> > > > > > > Security Release
> > > > > > >
> > > > > > > Hi Sachin,
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > June (release manager) asked me when the gerrit review #1680
> > > > > > > will
> > > > > be
> > > > > > > cherry-picked to 0.9.2-dev for testing and RC2.
> > > > > > >
> > > > > > > We confirmed that provisioning tool is working with
> > > > > > > https://gerrit.iotivity.org/gerrit/#/c/1680 but, without
> > > > > > > 1680, we failed to run it.
> > > > > > >
> > > > > > > If possible, could you please share the plan about this change?
> > > > > > >
> > > > > > > Thank you.
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > BR, Woochul
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > Choi, Soon Hwang
> > > > > > >
> > > > > > >
> > > > > > > Senior Engineer / Ph. D.
> > > > > > >
> > > > > > > Software Engineering Team (SE Team) Software R&D Center
> > > > > > >
> > > > > > > SAMSUNG ELECTRONICS CO.,LTD
> > > > > > >
> > > > > > > AnyCall +82-10-7311-0206
> > > > > > > e-mail soonhwang.choi at samsung.com
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > >
> > > > > > > _______________________________________________
> > > > > > > iotivity-dev mailing list
> > > > > > > iotivity-dev at lists.iotivity.org
> > > > > > > https://lists.iotivity.org/mailman/listinfo/iotivity-dev
> > > > > >
> > > > > >
> > > > > > _______________________________________________
> > > > > > iotivity-dev mailing list
> > > > > > iotivity-dev at lists.iotivity.org
> > > > > > https://lists.iotivity.org/mailman/listinfo/iotivity-dev
> > > > >
> > > > >
> > > > >
> > > > >
> > > > >
> > > > >
> > > > >
> > > > >
> > >
> >
> >
> 

Reply via email to