2 of the 4 CBU towers have been removed and in speaking with the engineer
responsible for the site, he told me they suspect the pattern has changed,
but are waiting on some technical studies to be completed to say for sure
just how much it has changed.

With 2 less towers and 25kw instead of 50kw, I'd there will be a change.

Paul



>
>
>
_______________________________________________
IRCA mailing list
IRCA@hard-core-dx.com
http://montreal.kotalampi.com/mailman/listinfo/irca

Opinions expressed in messages on this mailing list are those of the original 
contributors and do not necessarily reflect the opinion of the IRCA, its 
editors, publishing staff, or officers

For more information: http://www.ircaonline.org

To Post a message: irca@hard-core-dx.com

Reply via email to