Bhuvan Arumugam created AURORA-1183:
---------------------------------------

             Summary: job stay in PENDING: Host drained for maintenance, even 
though host is ACTIVE
                 Key: AURORA-1183
                 URL: https://issues.apache.org/jira/browse/AURORA-1183
             Project: Aurora
          Issue Type: Bug
          Components: Scheduler
    Affects Versions: 0.7.0
            Reporter: Bhuvan Arumugam


Example: 1. I schedule a job with 1 instance, 1 cpu and pin the job to specific 
host, the job stay in {{PENDING: Insufficient CPU}} state, if there is >1 cpu 
in the offer. It's expected.

Example: 2. I schedule a job with 2 instances, 1 cpu each and pin the job to 
specific hosts; one instance is scheduled/running. The other instance remain in 
{{PENDING: Host drained for maintenance}} state, if there is >1 cpu in the 
offer for this slave.

The error message in example 2 is incorrect. It should indicate that job is 
PENDING due to insufficient CPU.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to