Bhuvan Arumugam created AURORA-1183:
---------------------------------------
Summary: job stay in PENDING: Host drained for maintenance, even
though host is ACTIVE
Key: AURORA-1183
URL: https://issues.apache.org/jira/browse/AURORA-1183
Project: Aurora
Issue Type: Bug
Components: Scheduler
Affects Versions: 0.7.0
Reporter: Bhuvan Arumugam
Example: 1. I schedule a job with 1 instance, 1 cpu and pin the job to specific
host, the job stay in {{PENDING: Insufficient CPU}} state, if there is >1 cpu
in the offer. It's expected.
Example: 2. I schedule a job with 2 instances, 1 cpu each and pin the job to
specific hosts; one instance is scheduled/running. The other instance remain in
{{PENDING: Host drained for maintenance}} state, if there is >1 cpu in the
offer for this slave.
The error message in example 2 is incorrect. It should indicate that job is
PENDING due to insufficient CPU.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)